982–984 Post Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Nov 1983
To bring building full compliance with the provisions.
-
Dec 1995
To comply with umb ordinance.
-
Apr 2003
To install fire sprinkler system to comply with ordinance #172-02.
-
Feb 2007
Remodel 8 bathroom, 2 on each floor. (community bathroom) no structural work. no lighting work. provide fluorescent lights or occupancy sensors.
-
Feb 2007
Kitchen & bathroom remodel two units. repair walls after electrical & plumbing was done. three units. no structural & no lighting work.
-
Feb 2007
Reroofing.
-
Apr 2007
Comply with nov#200787593. kitchen and bathroom remodel one unit & b, one unit & b. replace walls-repalce vanity sink two units. no lighting work no structural work.
-
Apr 2007
Comply with nov# 200707593. no structural work. no lighting work. four units. kitchen & bathroom remodel. two units kitchen remodel. studio. total 6 kitchen @ six units. total 4 bathrooms @ four units.
-
Apr 2007
Comply with nov# 200707593. no structural work. no lighting work. six units. repair & patch wall after electrical & plumbing work. new water line & replace sink. less than 20% total walls of the units.
-
Jul 2007
One unit ktichen and bathroom remodel, one unit: kitchen and bathroom remodel, one unit: bathroom remodel reapir wall after electrical work was done (to comply with nov 3200787593) no structural, no lighting work, no window.
-
Nov 2007
One unit a & b: kitchen & bathroom remodel. one unit: bathroom remodel & kitchen. one unit: kitchen & bathroom remodel. two units: repair wall after plumbing & electrical work. one unit: bathroom remodel. no structural work on all units.
-
Aug 2013
Renovation of ground level exterior storefronts for all 4 tenant spaces. convert existing garage to new retail space for 1008 larkin street tenant. t.i. under separate permit.compliance with ord 155-13 not required.
-
Jun 2014
Remove e kitchen and bath cabinets, provide new wlec and plumbing for remodel. refinish existing floors. no walls moved, removed or added. all fixture layout to remain unchanged.
-
Apr 2015
Build retaining wall, dig trench for pge pipes and 2 vaults. fill pits with rock & fill place vaults. pour partial sidewalk and back fill trenches and pour topping slab.
-
Jul 2015
Change of use from retail to a new resturant. building of existing shell space into resturant include kitchen, hood, dining rooms, restrooms, lula lift. maher n/a.
-
Jul 2015
Work includes demolition existing sheetrock on columns, upgrade to code compliant stairs, new restroom, plumbing & electric ceiling fans. demolition per ab-017, accessibility features in future t.i. n/a ordinance #155-13.
-
Oct 2015
T.i. for barber shop: work includes partitions, nw millwork, nw electrical, lighting, & new mechanical. project will apply for change of use from an "m" occupancy to a "b" occupancy barber shop(personal service). the project is not formula retail. fire sprinkler work to be under seperate permit. n/a maher.
-
Nov 2015
One unit: kitchen & bathroom remodel. no allteration of walls, window and doors.
-
Mar 2016
Tenant improvement for retail clothing store. includes new stair, non structural partitons, freestanding millwork, new plumbing, electrical, lighting, new mechanical. fire sprinkler work to be under sep permit. maher not req.
-
May 2016
Remodel portion of basement floor. relocate laundry room, create new sparation for e boiler rooms and e electrical rm to accomodate for new storage. maher na.
-
Aug 2016
One unit: kitchen & bathroom renovation. replace existing exh fans, lightings to be remain. no new windows.
-
Jun 2017
Common area bathroom remodels, floor 1-4. (1) tub/shower, sink, toilet per floor. (as like).
-
Apr 2019
One unit: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required.
-
Feb 2024
Upgrade existing fire alarm system in non sprinklered building to comply with 2022 cbc/cfc, hfpa 72 and sffc sec 1103.7.6.1 existing facu, smoke detector, pull station and monitor modules to remain. add radio to mnitor system. horn/strobes in common areas and install low frequency sounders inside.
-
Dec 2025
Building facade maintenance & repairs to restore the outside of building. "like for like". seal & paint windows & fire escape, like for like street facing.