281–299 Turk Street
42-unit apartment building
-
1923
Built as the Padre Apartments, 49 unit apartment building, mostly 2-room units, to the design of the architects Baumann and Jose. Six storeys over a basement, reinforced concrete structure with stucco facade, two-part vertical composition, Renaissance/Baroque ornamentation.
-
Oct 1982
Additions alterations or repairs.
-
Mar 1983
Additions alterations or repairs.
-
Apr 2009
Convert existing unit on the ground floor into a laundry & garbage room. demolition existing walls & fixtures & replace with partitions to divide space into 2 rooms. work under this permit is limited to the ground only.
-
May 2010
Change of use from locksmith to pharmacy. remodel existing bath, new heating, upgrade existing electrical, new partition walls, replace ceiling tile in existing grid. (all work @ commercial unit.
-
May 2010
Otc alterations permit.
-
May 2011
Boa number 10-073 and nsr 20115183249 (prior app 201005212975)decision upheld to pay additonal fees.
-
Feb 2016
One unit | 305 | 406 | 508: kitchen & bathroom remodel for (4) units.
-
Mar 2016
One unit: kitchen & bathroom remodel. no layout changes.
-
Mar 2016
One unit: bathroom & kitchen remodel no change in wlal & opening layout. min 50% kithcne lighting wattage h.e; bathroomlighting h.e. or controlled by manual-on sensor with h.e. main light.
-
Aug 2016
Two units - relocation of existing kitchen to create additional bedroom. remodel existing bathroom as like, new fixtures. no exterior work visable from street.
-
Feb 2017
Uints 307 and 407: identical stacked unit remodel: kitchen and bath renovation. enclose bedroom, relocate kitchen.
-
Apr 2017
#301 - remove existing cabinets, relocate kitchen, add new bedroom, no structural, no exterior work.
-
Jun 2017
One unit: kitchen and bathroom remodel, no exterior work.
-
Jul 2017
Work in one unit: kitchen and bathroom remodel. no exterior work, replacing pipes and wiring. replace appliances.
-
Aug 2017
#607- conversion of studio into one bedroom, wall relocation. no exterior work.
-
Aug 2017
Two units: kitchen & bathroom remodel in each unit. no exterior work for each unit.
-
Jan 2018
One unit: kitchen and bathroom remodel. no structural changes. no rough framing and/or change of existing layout.
-
Feb 2018
Developement of existing one unit on 3rd floor. no vertical and horizontal extension. relocate kitchen and create new bedroom.
-
May 2018
Kitchen and bath remodel. no structural, no exterior. bath fixtures only. in kind remodel. one unit.
-
Jul 2023
Sffc sec 1103.7.6.1 fully sprinklered building. like for like fire alarm replacement/upgrade with radiot to monitor syste and low frequency sounders in sleeping rooms. including new facu (es-50x) 11 smoke detectors, 6 pull stations and modules to monitor sprinkler system.
-
Mar 2025
Ground floor- ti existing 1386sf institutional community use to create 3 private offices. reconfgiure staff break area and improve ventitation. modify existing disabled access features to enchance accessibility. continuatin of existing use with no change in use or occupancy. no chamges to facade, except to.
-
Jul 2026
Dry kings restoration has performed emergency sevices to restore and stabalize building after fire removal of non salvagable materials drywall, insulation, carpets, fie contents.
DBI holds 40 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 40. 3 of them are nominal $1 street-space or sidewalk permits. 2 cancelled permits are not shown.
Nearby
- 280–290 Turk Street Same street
- 294 Turk Street Same street
- 146 Leavenworth Street Same block
- 275 Turk Street Same block
- 140–144 Leavenworth Street Same block
- 166–180 Golden Gate Avenue Same block
- 151–161 Leavenworth Street Around the corner
- 201–225 Leavenworth Street Around the corner