318–320 Turk Street
50-unit apartment building
-
1924
Built as the St. Julienna Apartments, 48 2-room apartments. Six storeys over a basement, two-part vertical composition, Renaissance/Baroque ornamentation.
-
Dec 2013
Three units - kitchen and bathrooms remodel; paint apartments supply new electric and plumbing to areas of work, to comply with cec150(k) 8 & 10.
-
Mar 2014
Work in two units: kitchen and bath renovation, supply new electrical and plumbing to areas of work paint apartment refinish floors or provide pergo (laminate) replace kitchen cabinets, granite countertop, replace bathroom surroun, no structural work.
-
Jun 2014
Remove existing cabinets, provide plumbing & eelctrical to new kitchen & bath remodel. provide laminate flooring or refinish hardwood floors. paint apartments three units lighting & control per cec 150(k).
-
Mar 2016
One unit + 405: kitchen & bath remodel.
-
Oct 2017
One unit: kitchen - remodel in same location. no moving of walls, doors, or windows. bath - remodeling. electrical - upgrade to code plumbing - upgrade to code.
-
Jan 2018
One unit remodel kitchen & bathroom, same location, in-kind. upgrade electrical & plumbing to code in kitchen & bathroom. n/a for maher.
-
May 2018
Reroofing existing main roof and two lower lightwells (around 6, 000 sq ft) with modified bitumen. min 1/2: 12 slope, comply with 151 (f) 12.
-
Oct 2018
Revision to permit application 201810011927 one unit - convert existing kitchen to study, relocate kitchen, rehabilitate existing bathroom. install washer/dryer.
-
Dec 2018
#607: convert existing kitchen to bedroom. relocate kitchen, rehabilitate existing bathroom. install washer/dryer.
-
Mar 2019
One unit: convert existing kitchen to bedroom, relocate kitchen, rehabitate existing bathroom.
-
May 2019
#402: 1)convert existing kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate existing bathroom. 4)install washer and dryer. n/a for maher.
-
Aug 2019
One unit: convert existing kitchen and bedroom. relocate kitchen rehabilitate exiting bathroom, install washer and dryer.
-
Oct 2019
One unit - convert existing living room to bedroom; rehabilitate existing kitchen and bathroom, install washer/dryer.
-
Mar 2020
Upgrade existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. ** maher: n/a **.
-
Jul 2020
One unit: kitchen & bath remodel in kind. remove & replace bathroom fixtures same location. remove & replace kitchen fixtures same location approx 200 sq ftno exterior work. **maher n/a**.
-
Aug 2020
One unit - rehabit 1 bathroom and 1 kitchen. replace washer/dryer. no structural work.
-
Aug 2020
One unit. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations.
-
Mar 2021
One unit: revision to no-plan permit application 202102084198. convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer/dryer.
-
Nov 2024
To comply with nov 202430328: remove and replace lobby ceiling 96 sq ft walls 106 sq ft. 2nd floor hallway remove and replace ceiling 35 sq ft walls 162 sq ft. one unit: demolition 3rd floor hallway ceiling 12 sq ft wall 63 sq ft bathroom demolition walls. two units.
-
Aug 2025
Make repairs, facade maintenence, remove, prep and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces.
-
September 18, 2026
Tenderloin Buzz: Small businesses galore! — Mission Local
DBI holds 58 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 58. 4 of them are nominal $1 street-space or sidewalk permits. 5 expired or cancelled permits are not shown.
Nearby
- 311–321 Turk Street Same street
- 323–333 Turk Street Same street
- 308–310 Turk Street Same block
- 237 Leavenworth Street Same block
- 201–225 Leavenworth Street Same block
- 350–354 Turk Street Same block
- 151–161 Leavenworth Street Around the corner
- 222 Leavenworth Street Around the corner