10–50 United Nations Plaza
Tenderloin · San Francisco, CA 94102
-
May 16, 1936
The first purpose-built federal office building in San Francisco. Arthur Brown Jr., architect of City Hall, designed the four-storey granite-clad building around a central courtyard in the American Renaissance style to sit with the rest of the Civic Center. Ground was broken on 17 January 1933 before the money existed; the Public Works Administration granted $2,689,089 that August, construction began in early 1934 employing 300 men, and the building was dedicated on 16 May 1936. Staff of 33 federal agencies moved in. It was vacated in 2007 and rehabilitated in 2013.
-
Apr 1979
Created during job card conversion on: 03/04/83.
-
May 1982
Building use: offices.
-
Jul 1982
Building use: office/com./bank.
-
Oct 1985
Construct 6158 sq ft of tenant interior space on second floor.
-
Sep 1987
Tenant improvement/create 26 separate offices.
-
May 1988
Tenant improvement @ portion of 3rd & 5th floors.
-
Oct 1989
Interior tenant build out, metal stod & gypsum board wall.
-
Mar 1999
Oti-1 2/d el me ls.
-
Apr 1999
Oti-1 3rd floor, el, me, l/s.
-
Mar 2000
Oti-1 5/f el me ls.
-
Sep 2008
Upgrade of rooftop mechanical equipment & assocaited structrual, plumbing & electrical req'd operation of said mechanical equipment.
-
Sep 2008
Tenant improvment 6th floor of e low rise office building. tenant is an adult educational school (b occupancy) with classrooms and instructional food facilities. project will provide acessible toilet facilities. all classroom occupants above 12th grade. life safety sep permit.
-
Jan 2009
5th floor tenant improvement of an existing low-rise office building of about 10, 500 usable sq ft. the tenant is an adult educational school with classrooms & office space for facility. additional accessible toilet facilities are being provided. sprinkler/life safety will be submitted under separate permit.
-
Apr 2009
Tenant improvement 1st floor of an existing low-rise office building of 4703 usable sq feet. tenant is an adult educational school (b occupancy) with classrooms & storage. additional accessible toilet facilities are being provided. sprinkler will not be provided. life safety will be submitted under seperate.
-
Apr 2010
United nations plaza. tenant improvement ( approx. 7, 741 sq ft). selective demolition of existing interior wall and new construction of class rooms, open office and restrooms. no sturtural work. no exterior work.
-
Aug 2015
4th floor: new framed walls, new restrooms, new paint and associated mechanical and electrical work. maher na.
-
Oct 2018
2nd & 3rd floor - demolition of interior non bearing walls per ab-017.
-
Feb 2019
Add new single story elevator access from existing 6th fl to roof level and adding new roof deck with trellis.
-
Jul 2019
Ref permit application 201904107633, 200903244753; nfpa 13 fire sprinklers system installation ground fl. - 4th fl.
-
Sep 2020
2nd & 5th fl: tenant improvement. add few non-bearing walls, general clean up of finishes, add a new kitchnette at 2nd fl.
-
Jul 2021
Outdoor vrf units for core project originally installed in late 2019. outdoor air fan was also installed during this time. this project installs the indoor vrf fan coils, branch controller, refrigerator piping & ductwork for t.i. project. reference permit application 202105059849.
-
May 2022
2/f spec suite: t.i. & infrastucture upgrades on roof & mechanical rooms on each floor.
-
May 2022
Ground floor: tenant improvement. roof: infrastructure upgrades. new mechanical on rooftop.
-
May 2022
3rd floor spec suite: tenant improvement. roof: infrastructure upgrades and mechanical rooms on each floor.
DBI holds 143 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 143. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update