120–130 Kearny Street
Union Square · San Francisco, CA 94108
Permit history
-
Mar 1979
Created during job card conversion on: 03/04/83.
-
Sep 1999
Installation of a new standby/secondary generator.
-
Nov 2012
Interior t.i. on 6 & 7 floors only. reference permit application 2011-06-29-9168. niew interior partitions, new communication stair, new flooring, new carpet & paint. re-working existing ceiling. mechanical, electrical & plumbing are deferred submittals. sprinklers are deferred submittal.
-
Mar 2014
20/f-demol existing non-structural int partitoins in restroom, doors, frames, hardware, millwork, ceiling, finishes, mep. construction of non-structural partitions, doors, frames, hardware, millwrok & acoustical ceiling, finishes, mep deferred submittal for life - safety. n/a compliance with ordinance #155-13.
-
Mar 2014
19th floor: demolition of existing non-structural interior partitions, doors, frames, hardware, millwork, ceilings, finishes, mep, construction of non-structural partitions, doors, frames, hardware, millwork, acoustical ceiling, finishes. mep deferred submittal for life-safty.
-
Apr 2015
30th floor: t.i. to include construction of new non-structural partitions. new acoustical grid and tile and gyp board ceilings, new finishes throughout. mechanical electrical and life safty under seperate permit. structural under seperate permit.
-
Aug 2016
5th, 6th and 7th floors - ti, demolition, non-structural partitions. all new or revised mep & life safety/srpinklers will re design build and submitted separately (building is fully sprinklered).
-
Nov 2016
20th floor: demolition & construction of new partitions, acoustic ceiling finishes & ada upgrade of restroom. mep, fire and life safety on separate permit; maher n/a.
-
Apr 2017
16/f: demolition and construction of partitions, finishes, millwork 16th fl mep, life safety, sprinklr sep permit, maher ord 155-13 na.
-
Jun 2017
17/f: t.i. to include offices, workstations, pantries and conference rooms. does not include core bathrooms, fire life saftey and sprinkler under sep permit. mep., plumbing & electrical under seperate permit. maher na.
-
Jul 2017
19/f- amep plans - full floor t.i. to demolition and construct new partitions, finishing, millwork and mep., life safety and sprinkler under seperate permit. n/a ordinance #155-13.
-
Jun 2018
9th floor. construction of new non-structural partitions. new acoustical tile and gyp board, ceilings, new finishes. mep, life safety & fire sprinkler under separate permit. new sink at mother.
-
Jul 2018
Full floor single tenant ti on 2nd fl including selective demolition, construction of partitions, ceiling, raised floor, millwork, including structural (calcs for support & anchorage for nanowall, trading desk millwork, guardrail/handrail, partition bracing and floor loads), mep. no change in use.
-
Aug 2018
10/f: construction of new non-structural partitions, new acoustical grid and tile and grip board ceiling finishes throughout. mep, fire sprinkelr under separate permit.
-
Oct 2018
24/f: tenant improvement to add new non-load bearing partitions, including a 1hr rated corridor, doors, glazing, millwork, finishes, ceiling and mep systems. life safety & sprinklers on seperate permits. maher n/a.
-
Feb 2019
Remove and replace main chillers and main chw pumps. complete installation of regrigerant purge exhaust system and start-up. n/a maher.
-
Jun 2019
8th fl, ste 800 ti to consist of new non-structural partitions, finishes. mep & fire life safety under separate permit. demolition under permit application 201906113081.
-
Nov 2020
4th fl: new speculative suite with non-structural partitions, lighting & finishes. m.e.p. included.
-
Jun 2022
Interior ti: new non-structural partitions, light fixtures, finishes, millwork, plumbing fixtures. remodel elevator lobby & common corridor. upgrades to restrooms accessability. mep & structural included. fire, life safety & sprinkler under separate permits.
-
Aug 2024
23/f suite 2350: interior t.i. - removal and new non-structural partitions, finishes, millwork, and plumbing fixtures. upgrades to restrooms for accessibility, common corridors and 23/f elevator lobby. mep, fire life-safety and sprinkler under separate permit.
-
Sep 2024
Tenant improvement: selective demolition and constructin of non-structural partitions, new finishes, light fixtures, and millwork. roof infill scope. mep and fire life safety under separate permit.
-
Oct 2024
38/f: deferred mep permit for permit # 202409261701 office tenant improvement.
-
Dec 2025
Install new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy.
-
Feb 2026
L24. ti demolition of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep.
DBI holds 530 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 530. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. The city's Modern & Postmodern styles context statement dates this building 1982; the assessor's roll records it as built 1980. Submit an update