350–360 Post Street
Union Square · San Francisco, CA 94108
-
1959
The Qantas Empire Airways ticket office, 1959, by Skidmore, Owings & Merrill.
-
1970
Qantas Airlines Building, designed by Edward Charles Bassett of Skidmore, Owings & Merrill.
-
1972
Built.
-
Jun 1981
Wall or painted sign.
-
Mar 1991
Renovation of existing ground & 2nd facade including n/granite.
-
May 1991
Tenant improvements.
-
Jun 1998
Interior modification of existing retail space.
-
Jul 1998
Oti el me ls sp 8/f.
-
Apr 2004
Interior remodel of retail store. no exterior work under this permit.
-
Sep 2005
Replacing the existing chiller with a new 6-modular chiller system. replacing the water pumping system. replacing water booster pumping system.
-
Mar 2012
Interior renovation of 12 story building on all floors, including architectural, mechanical, electrical & plumbing, lighting, ceiling system replacement, bathrooms, elevator lobbies & corridors. no ext'r work under this permit. fire protectn under separate permit. primary work is hvac replacement.
-
Apr 2012
Separation of tenant utilities from landlord system work to include chilled water, heating hot water, domestic hot water, emergency lighting back up cutting and patching of ceilings for mechanical work above ceiling. add 30 fsds, remove 15 fds. new bas panel (must be listed as compatible).
-
Jun 2013
Ste 400: tenant build out of approx 2800 sq ft. work includes drywall, concrete floors, acoustical ceilings, electrical, mechanical, plumbing and fire sprinklers and finishes such as paint, wall paper, use will be for doctor's office (dermatologist).
-
Jul 2013
3rd-11th floors-replace of existing fireproofing products & systems at floors 3 to 11 at existing steel structure required by hvac replacement project under permit application 2012-0316-6226.
-
Dec 2014
8/f: office ti on the 8th fl including new partitions, fixtures, finishes, mechanical and electrical. no exterior work. fire protection under sep permit.
-
Feb 2015
Facade renovation including expansion of glazing area, replacement of exterior finishes on ground and 2nd level and removal of awning and scones.
-
Apr 2015
Ground floor & basement: phase 1b - ti for existing retail store. work includes new partitions, casework, fixtures new ada restrooms; re-cladding of existing elevator lab. no exterior. mep & fire protection under sep. permit.
-
May 2015
Mep work for ti. of retail store, no exterior work, fire protection under separate permit.
-
May 2015
T.i. construction of non structural partition, elevator, restrooms. new staircase- basement, first & second floor. mep under seperate permit, fire deferred.
-
Mar 2016
10th floor: ti buildout - interoir only.
-
Aug 2017
Suite 900: t.i. on a single floor to include work for new partitions, doors and frames, celings, finishes, lighting, casemwork, electrical and mechanical.
-
Dec 2017
5th floor: ti - build out entire 5th floor, including demolition min work in elevator lobby, corridor & toilet rooms.
-
Feb 2018
9th fl: renovate office suite with new partitions, ceilings, and doors, new and revised lighting and mechanical systems, new electrical & data communicaiton cabling. new finishes throughout. life safety work to be design build under sep. permit. no ohspd.
-
Apr 2018
7th - ti of existing office space.
-
Aug 2018
Accessibility of upgrade for floors 4, 6, 9, 10, 11. work includes upgrading existing bathrooms and elevator lobby and adding drinking fountains off path of travel corridors.
-
Jan 2019
Mechanical - demolition existing sand filter service adjust existing water treatment chemical system install new cooling water filtration separator remove & replace all piping from chiller to main basement.
-
Oct 2019
1st floor: t.i to "tiffany & co" work includes new non-structual partition, furnitures, fixturs, finishes, lighting and mep.
-
Mar 2021
Replace current generator (90kw diesel) for emergency lights and one elevator with manufacturers recommended in-kind unit. will serve: 40hp fire pump, 1hp jockey pump, 40hp elevator (only 1 for emergency), 5hp sewage ejector pump 1 and 2.
DBI holds 367 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 367. 10 of them are nominal $1 street-space or sidewalk permits. This building's context statement dates the work 1970; the assessor's roll records the parcel as built 1972.
Nearby
- 278–290 Post Street Same street
- 384–398 Post Street Same street
- 441–443 Sutter Street Same block
- 445–447 Sutter Street Same block
- 431 Sutter Street Same block
- 345 Stockton Street Same block
- 433 Powell Street Around the corner
- 418–432 Sutter Street Around the corner