Built as the Schlage Lock Company's office building (Building A), a Spanish Colonial Revival design by William P. Day with associate architect H. M. Michelsen.
-
1926
Plant 1, the first warehouse on the Schlage Lock Factory site, was built to designs by William P. Day and H. M. Michelsen.
-
circa 1947
Plant 2, a concrete warehouse with a curved corner at Visitacion Avenue, was built to designs by Day and Michelsen.
-
1948
Built.
-
1950
Two more Schlage Lock warehouses, Plants 3 and 3X, were built to designs by Alfred F. Roller with engineer H. J. Brunnier.
-
March 30, 1960
Photographed, showing the Schlage Lock Company.
-
Mar 1995
Reroofing.
-
1999
Schlage Lock ceased all manufacturing at the plant.
-
Mar 2000
Erect a one story commercial building.
-
Sep 2004
Demolish 1 story warehouse for lock parts.
-
Dec 2008
Demolish a 2 story warehouse.
-
Dec 2008
Demolish a 1 story warehouse.
-
Jul 2015
Rehabof historic building for use as office space. rehab/replacement of windows, seismic upgrade, new roof deck o/existing skylight area, interior ti for office space includ sales office & model unit, accessibility upgrade new elevator & lift from sidewalk. rated assembles for potential future a3 & i4 uses.
-
Jan 2016
Construction of 2 retaining walls - cast in place concrete and versa-lok wall. cast in place wall is 315 feet long and versa lock is 324 feet long. guard rail installed for totla length of wall. maher req.
-
Apr 2016
Interior non structural demolition, no exterior work, permit to comply with ab-017; maher n/a.
-
Apr 2016
To complete work and to obtain final inspection for work approved under permit application 200907172930.
-
Apr 2016
Site clearing of vegetation and preparing for future grading work. no soil import or export.
-
Apr 2016
Construction of 2 retaining walls - cast in place concrete and versa-lok wall. cast in place wall is 315 feet long and versa lock is 324 feet long. guard rail installed for total length of wall. maher req.
-
Jul 2016
Revision to 201604195141: change to direction of retaining wall, southern termination of wall. maher on previous permit.
-
Aug 2016
Rough grading for future utilities n/a for maher ordinance no.155-13.
-
Oct 2016
Construction of 240 feet of ultrablock wall. n/a for maher ordinance no.155-13.
-
Apr 2017
Demolish one story for storage. ** maher: n/a **.
-
Dec 2019
Mayor ed #17-02. priority processing to erect new 5-story (1) basement, type ii, 146 dwelling units with mixed-use building (r-2, s-2 & a-3).
-
Oct 2020
Revision to the issued permit number 2015-0701-0504. tenant improvement of existing building. new non-bearing interior partitions, doors, interior glazing, millwork, and finishes throughout. relocation of an elevator that was planned in a previous core-shell rehabilitation project.
-
Apr 2021
Fire life safety: install (18) ceiling horn strobes, (3) wall weather mount horn strobes, (13) ceiling strobes, (1) booster panel power supply, (1) fire alarm control panel, (1) bell, (1) led annunciator, (1) heat detector head.
-
Jun 2021
This is a fre only sprinkler system installed in an existing 4-story building, with a design criteria of light hazard, and ordinary hazard in electrical rooms, storage, etc.include 6" c900 underground. ref # 2020-1023-7295.
-
Oct 2021
Install new 6'-0" tall metal picket fence along front property line of existing building, including gates. the fence will be 108'-6" wide.
DBI holds 25 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 25. 4 expired or cancelled permits are not shown. Sources disagree on when Plants 3 and 3X went up: the report's resource chapter says 1950, its project description says 1963 and 1967. Sources disagree on when Plant 2 went up: the report's resource chapter says around 1947, its project description says 1943.