240 Leland Avenue
Church
-
December 12, 1906
A permit was issued to build a small wood-frame chapel, 24 by 36 feet and 20 feet tall at a cost of $900, on this lot for a neighborhood church and Sunday School.
-
1908
The Presbytery of San Francisco formally recognized St. James Presbyterian Church, then 69 members strong.
-
March 5, 1908
A permit was issued for a one-story 25-by-50-foot building behind the chapel, later mapped as a gymnasium.
-
August 6, 1917
A two-story 12-by-25-foot addition to the chapel was permitted, with a kitchen, two toilets and a hallway below and two rooms above, the work to be done by church members.
-
1922
Before the present church went up, the original 1906 chapel was moved off the lot and around the corner onto Schwerin Street, where it became a house.
-
1922
The new church cost about $9,500, paid by the congregation with a $2,800 grant from the Presbyterian Board of National Missions.
-
June 19, 1922
A permit was issued to add a dressing room and showers to the rear gymnasium building.
-
July 10, 1922
Julia Morgan completed plans for the church, a T-shaped two-story frame building with a Sunday School below and the sanctuary above.
-
July 14, 1922
A permit was issued for a 48-by-56-foot, two-story wood-frame church on a concrete foundation, clad in stucco and rustic siding.
-
July 15, 1922
A construction trade journal announced that Julia Morgan had won the design of a two-story-and-basement frame church for the congregation.
-
1923
In place of the rose and arched windows Morgan drew, the facade received a stained-glass window of the Parable of the Sower, made by Campbell Glass and Paint Co. of Kansas City and, by congregation lore, salvaged from a church in a Nevada ghost town.
-
March 13, 1923
The new church building was dedicated.
-
1938
By 1938 the 1908 rear gymnasium building had been cleared, leaving the back of the lot empty.
-
1951
With the Sunday School crowded, the congregation began planning a rear addition.
-
May 13, 1955
A permit was issued for a rear addition of 1,292 square feet upstairs and 960 downstairs, holding a small chapel and four classrooms and shortening the sanctuary by about one bay.
-
1961
The kitchen was remodelled.
-
1972
The sanctuary received its present pews as a gift; several original pews went to the rear chapel.
-
1989
In the late 1980s the Presbytery of San Francisco reorganized St. James as a mission church and its first Filipino ministry.
-
1990
The congregation ordained its first Filipino pastor.
-
Jan 1997
Existing child care, increase in occupant load from 12 to 20.
-
2000
The building was re-roofed.
-
Aug 2000
Reroofing.
-
Sep 2010
Insall new acorn stair lift, 300 bls chair capacity with hinged rails.
-
2014
A chair-lift was installed on the stair to the sanctuary.
-
2019
With membership dwindling, the church chose not to replace its retiring pastor and closed for nearly two years.
-
2021
The church partly reopened late in the year with a part-time pastor.
-
December 13, 2022
Designated San Francisco Landmark No. 308, St. James Presbyterian Church.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline. The rear building is shown gone by 1938, yet part of it still appears as a shed on the 1950 fire-insurance map.