501 Tunnel Avenue
Assessor class: vacant lot · Visitacion Valley
-
April 13, 1995
A household hazardous waste facility operated on the property; a Local Assessment Committee appointed by the Commission in 1992 was advising on terms for its proposed expansion.
-
April 1997
The city's Household Hazardous Waste Facility operated here, at the Sanitary Fill Company complex.
-
Sep 2018
Add 330 solar panels to existing solar system on new west wing structure.
-
Dec 2018
As built for pa e2018-1009-6354, 2018-0611-1544 and 2018-0925-1268.
-
Aug 2019
Add fire alarm panel to monitor existing sprinkler system in (hhwcf) hazardous waste.
-
Sep 2019
Fire alarm system ti - replace existing fire alarm panel in bld ga/gc.
-
Dec 2020
1. demolition all sprinkler piping & sprinkler heads in existing conveyer and platform in area 'a' only. 2. install new fire riser at existing riser area to apply existing and new platforms & conveyer new sprinkler heads, hanger and spacing.
-
Apr 2021
Submitting as-built drawings per inspector during final inspection for approval. ref # 2020-1215-1028.
-
May 2021
Install 500' of supply piping to reconnect 2nd water source to existing building. 20' underground 480' aboue ground.
-
May 2021
Remove and replace old voluntary back up generator on exterior of waste transfer facility. generator will be removed and installed by owners operating engineers (slef performed). install 600kw diesel generator.
-
Jun 2021
Install an integreated material recovery facility (imrf) for recology. the imrf design will included but not limit to erection of new recycling facility. no structural work to the existing building. no modifications to building equipment install on existing plant.
-
Jan 2022
New sprinler riser into existing fire control panel furnish and install (2) monitor modules for the new sprinkler riser water flow and tamper switches.
-
Jun 2026
Reroofing. no hotworks.