175 Frida Kahlo Way
West Of Twin Peaks · San Francisco, CA 94112
-
1950
Built.
-
November 17, 1958
Photographed, showing the Riordan High School.
-
Aug 2000
Install hood duct fire suppression system only.
-
Feb 2001
Renovation of existing science labs & two lecture rooms-minor demolition, new elevator.
-
Nov 2002
Remodel existing women's bthroom on ground floor for disabled access. barrier remoral only this permit.
-
May 2005
Construction of 3 2-story building within 2 existing courtyards with landscaping (condition use #2004.1135c.).
-
Jan 2008
Reactivate two 2-story horizontal additions within existing east courtyard. original plan app#200505273632 included a third 2-story addition that was deleted from this plan. resulting occupant load increase is more conservative now.
-
Mar 2008
Building #12 - install new 0.8 piping to supply new automatic fire sprinklers and install 8" underground for entire complex.
-
Mar 2008
Building #13 - connect sprinkler system to underground appl#200803177246 new system per nfpa13.
-
Nov 2008
Building #13- fire sprinkler system, 29 new heads & connect to 8" new underground & 6" new tunnel supply.
-
Nov 2008
Building #12- fire sprinkler system, 17 new heads. connecting to 6" sprinkler underground tie-in, completed under 2008/11/17/6669.
-
Apr 2011
Interior non structural renovation of existing dormitory rooms, president's library, bathroom & student lounge.
-
Jun 2011
Install fire sprinkler system on the 3rd floor.
-
Jun 2018
Install ul 300 kitchen hood fire suppression system on existing hood. ref t.i. #200801223010.
-
Jul 2019
Bild 2 new dugouts, upgrade existing restrooms for accessibility compliance.
-
Jun 2020
Interior renovation of existing locker roomsand weight room to include new women's locker room, bathrooms, team room, new men's locker rooms. mep under a separate permit.
-
Aug 2020
Mechanical and electrical work. architecture under 202006098293.
-
Jun 2022
Reroofing. to comply with coof roof requirements per 2019 california energy code 141.0(b)2b.
-
Jun 2022
Interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical.
-
Apr 2023
2nd fl. renovation of existing library and accessory rooms, work to include (2) new classrooms and video studio verticle platform lift to be provided for accessibility.
-
May 2024
Conversion of 2 existing classrooms into 9 counselor's offices. scope of work to include electric work.
-
Jun 2024
Cosmetic upgrades of existing dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mechanical and sprinkler under separate permit.
-
Jun 2024
Barrier removal- demolition of existing ada wheelchair lift and steps. replace with new ada compliant ramp and steps.
-
Jul 2024
Revision to 202406043620: revised ada toilet stall & shower location, reframing e) walls. no fixture count changes.
-
Jul 2024
Fire sprinkler system 71 sprinklers ref permit application 202406043620.
-
Aug 2024
Installation of new fire alarm sprinkler panel on 3rd fl.
-
May 2025
Barrier removal; non structural renovation of existing restrooms to gender neutral multi-accomodation ada compliant restroom.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31.
Nearby
- 50 Frida Kahlo Way Same street