678 Portola Drive
Church · West of Twin Peaks
-
1955
Built.
-
1955
Ebenezer Lutheran Church, 1955, by John C. Portman Jr.
-
Dec 1989
Reroofing.
-
Dec 1999
Install cellular telephone equipment cabinets antenna roofto.
-
Apr 2001
Install nextel antennas and radio equipment.
-
Jul 2001
Nextel wireless comm. facility, relocated equipment room.
-
Oct 2001
Revision to appl. # 200110191231, revision to structural foundation plans.
-
Mar 2002
Minor alteration of existing conditional use authorization #1612, change to max.radiated powe of emm.
-
Aug 2003
Install radio equip on pad next to church, power from existing panel, antennas, one in steeple &one on roof.
-
May 2009
Remove existing 3303 1900 cabinet and install new ericsson rbs 3518 850/1900 cabinet and 2 remote radio units (rru's).
-
Apr 2010
Interior remodel: existing living space to be expanded, addition of bathroom, upgrade electrical, kitchen remodel, lighting, hvac unit insulation, replace windows, gen. finishes, work non-structural, non-seismic, no new sq ft. added, only interior alterations. (to comply with complaint #201039282).
-
Jan 2011
Replacement at&t wireless communication facility, remove 3 steeple mounted antennas & installation of 9 int.steeple mounted behind frp panels. remove existing equip. cabs, replace/install 9 new cabs in existing lease/equip.area. replace existing wooden fence w' new fence associated power teleco and coax.
-
Jul 2014
Removal of antennas, coax, mounts, and radio equipment. (nextel) n/a for the maher ordinance #155-13.
-
Nov 2015
Verizon wireless propose to install 6 new panel antennas concealed behind existing steeple in addition add 9 new rru units and 3 new surge suppressors. new equipment cabinets will be located in existing building. storage room. remove existing panel antenna and mount. n/a ordinance #155-13.
-
May 2018
At&t wireless - swap 9 antennas, installed 12 rrus inside steeple, swap 12 batteries, install ac breakers, ac cabling and conduit for power plant.
-
Aug 2020
At&t proposed to remove and replace 3 antennas & 3 new rru's. install 3 surge suppressor, 3 new dc power trucks, 3 new fiber trunk. remove 2 rbs cabinets. install 1 dc-12 surge supprssor, 1 6630 basebank, 1 battery cabinet, 3 rectifiers, 4 batteries.
-
May 2021
Level 3/4 of steeple - swap 6 panel ants for 6 new located inside of a screened steeple at church. replace 9 rru radios with 6 new, replace 2 ovp surge prots with 2 new surge prots and remove one 6 x 12 hybrid cable with one 12 x 24 hybrid cable. sffd oper permit required for exceeded battery limits.
-
Mar 2022
At&t: remove + install 3 antennas. install 1 new dc6squid, rf safety signs, burriers/stripping. install 4 new 175ah batteries in existing cabinet. 2 new rectifiers in existing dcpp, 1 new 6648 baseband in new fix21 v2 cabinet and 1 1/4" fiber trunk.
-
Nov 2022
Revision to permit application 2022-0310-9643: change of scope to remove not install proposed cabinet in detail 3/a-2 and detail 2/a-5. reduction of work. remove cabinet & special inspection requirements.
-
Dec 2025
At&t modification of existing wireless facility consisting r/r 3 antennas; remove 6 rrs & install 3; relocate lower 3 antennas; remove 1 macro cabinet; 1 infinity cabinet & rectifiers; install 1 netsure power plant; 12 rectifiers; 11 converters; (1) 15 amp & 6 (50) dc breakers; install (4) 190 a batteries.
-
Apr 2026
Revision to 202512111485- att modification to existing wireless facility change 6x 3/4 in conduits from the ac panel to powerplan to 2x 2 inch conduits.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline. 5 cancelled permits are not shown.
Nearby