300 Ulloa Street
West Of Twin Peaks · San Francisco, CA 94127
-
1960
The First Church of the Nazarene was built on a graded bench cut into a former rock quarry north of Ulloa Street.
-
Dec 1986
The unstable rock slope behind building is to be stabilized.
-
September 1987
The church reopened after work behind the building to stabilise the hillside, which had been shedding rockfalls and landslides onto the site since 1960.
-
Sep 1991
Stablized rock slope with rockbolts & mesh.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Oct 1991
Erect a three story single family dwelling.
-
Jul 1992
Fill & excavate.
-
Jan 1994
Revised to reflect relocation of fireplace & addition window.
-
1995
Built.
-
May 1995
Rev.to existing pa. changes to int partitions, windows, kitchen.
-
Nov 1996
Erect a three story single family dwelling.
-
Dec 1996
Open slope block 2876 parcel a.
-
Apr 1997
Temporary rock catchment fence.
-
Jun 1997
Slope stabilize project site grade/const concrete belt beam.
-
Dec 1997
Reroofing.
-
Dec 1998
To install custom wrought iron gate/remote control activated.
DBI holds 38 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 38.