1016 Laguna Street
Western Addition · San Francisco, CA 94115
Permit history
-
Jan 1991
Cracks repair with epoxy injection.
-
Feb 1991
Erect a two story field ofice-sffd fire alarm building.
-
Sep 1996
To erect 2 stories of office.
-
Sep 1996
To erect basketball/vollyball court.
-
Jul 2000
Gen renovation for accessibility, roofing replacement, handicap ramp.
-
Dec 2000
Street space.
-
Mar 2001
Provide 2 new wood exit stairs from the building. for use while adjacent building. under construction.
-
Apr 2001
Street space permit.
-
May 2002
Remove interior remove roof and top floor remove 1/2of basement close existing openings with concrete or cmv.
-
Sep 2007
Modifications include demolition of partitions, portions of existing mechanical and electrical systems, construction of new conference room with audio visual system, new exterior exit stairs and upgrading existing ada components.modify existing sprinkler &fire alarm systems.
-
Nov 2008
Selective interior demolition of an existing building. (2/fl). construction of new partition. construction of new breakrm., office & conf. rm. painting of new & existing walls & suffit. relocation of electrical outlets, lighting & lighting controls. fire alarm & sprinkler under separation permit.
-
Feb 2012
Demolition wall partitions, door, laundry hook-ups, drain lines, casework, drop ceil. resheath 5/8" type x gyp bd. electrical - install ups, trasformer, panel, breakers. air cond. unit install for electrical room. pre-action fire spr s/s for electrical room. sprinkler and fire alarm under separate appl.
-
May 2013
Renovate existing 2nd floor admin. office. construction of new office (216a, 216b). construction of new glazed partition. relocate electrical outlets and motion sensor. replace light fixtures with led light.
-
Oct 2017
T.i. to rooms 102 and 251a to facilitate new training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a.
-
Jan 2018
Tenant improvement 2nd fl training rm 251-b, training managers 251-c. maher na.
-
Apr 2018
To erect 1 story, 1 basement, type v-b, community center & storage. (a-3, s-2) ** maher: n/a **.
-
Nov 2018
Demolish two story type v construction (office/bleacher storage) building at 1003 turk street.
-
Nov 2018
Demolish two story type v construction (office) building at 1003 turk street.
-
Jul 2019
Int renovations to break room, storage, tech rm and eoc support room in the 1st floor of existing bld.
-
May 2020
Modernization of an existing elevator. new car controller, car guides, power unit, elevator door operator & hardware, car operating panel, position indicators, signal fixtures, landing system, and wiring, new disconnect switch, power-feeders, gfci receptacles & machine room lighting.
-
Jan 2022
T.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor.
-
Aug 2024
Remove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garage.
-
Sep 2025
Ups replacements including batteries with structural anchrage & removed of existing equipement. installation of nw transformer & removal of existing tranformer, removed of existing mechanical unit & intallation of new ac unit, cutting & patching of finshes, fire partitions & fire rate doors.
-
Nov 2025
This project replaces hvac equipment/system and provides limited tenant improvements including modification of selected interior door for equipment passage.
-
May 2026
This project replaces electrical distribution such as switchboard and motor control centers and provides a working sequence plan for temporary power to have the entire facility operational during construction.
DBI holds 62 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 62.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. The roll classes this parcel as a vacant lot and also gives it a build year of 1900. Submit an update