3801 3rd Street
Bayview Hunters Point · San Francisco, CA 94124
-
1985
A clinic at the Bayview Hunters Point Foundation housed Multicultural Inquiry and Research on AIDS from 1985 and later the Black Coalition on AIDS, which provided education, advocacy, case management, needle exchange, street outreach and transgender services.
-
Sep 1985
Erect commercial building.
-
Sep 1988
Tenant improvements for future retail space.
-
Nov 1988
Tenant demising wall, interior partitions.
-
Feb 1989
Office tenant improvement.
-
Mar 1989
Tenant improvements.
-
Jul 1989
Construction of tenant improvements for warehouse records.
-
Aug 1989
Demising walls & interior partitions, toilet rooms.
-
Sep 1989
Office tenant improvement, interior partitions, doors & fram.
-
Oct 1989
Interior alterations in a portion of existing commercial building.
-
Feb 1990
Ground floor - corridor walls, tenant demising wall.
-
Feb 1990
Tenant improvement.
-
May 1991
Erecting corridor walls, interior partitions, door & wall.
-
Mar 1992
Tenant improvement of existing tenant space. add partitions.
-
Oct 1997
Cti-1 2nd floor el, me, sp.
-
Jan 1998
Cti-1 floor 2nd el me sp.
-
Oct 2008
Duro last roof on commercial building. cool roof crrc approved duralast.
-
Sep 2009
Suite 110 - ti-chg of use fr office to laundromat, self coin laundry, arch partition walls, refinish non-stru elements within space, mechanical, mod existing hvac, add services for laundry equipment, plumbing. provide/modify serv for laundry machines, electrical, modify existingadd serv for laundry equip.
-
Jun 2015
Remove some interior wall and build new ones on 2/f as shown on plans. n/a ordinance #155-13. mep, life safety shall be design-build on separate permit.
-
Apr 2016
Change from 2 vacant retail to 1 coffee shop. exterior: replace existing doors, glazing, repaint existing window mullions. interior remove wall install new floor penetration, install new specialty equip, plumbing fixtures, casework, new wall, floor & ceiling finishes. fire under separate permit.
-
Aug 2021
Modify an existing wireless facility on rooftop. replace 2 antennas, add 1 antenna, replace 6 rrus, replace 1 ovp, remove 12 runs coax, replace 1 hybrid cable, add 2 conbiners. at base station: remove 6 rrus, replace 1 ovp.
-
Oct 2021
Space 300: t.i. interior only. in include non-bearing partitions, gyp board ceiling, walk-in coolor, freezer, finishes. mep work and new u/g grease interceptor. maher n/a.
-
Feb 2022
Change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mechanical equipment & product shelving.
-
Dec 2024
Replace & remove 1 rooftop ac unit with likt for like replacement in same location on the roof.
-
May 2026
Starbuck building: reroofing no hot works.
DBI holds 167 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 167.
Not yet documented: the architect and builder and the early tenants. Submit an update