5172–5176 Third Street
Bayview Hunters Point · San Francisco, CA 94124
-
1920s
One of the two most ambitious masonry mixed-use buildings of the 1920s boom on Third Street, with 5024–30: three storeys clad in yellow brick, with extruded sheet-metal-clad bay windows, a bracketed cornice, two storefronts at street level and two levels of apartments above.
-
Apr 1986
To bring into code.
-
Apr 1987
Remove plumbing from penthouse.
-
Aug 1992
Repair stairs.
-
Oct 1997
Reroofing.
-
Jan 2000
Dry rot and termite repair.
-
Oct 2004
Repair or replace all complaints/building#200452623.
-
Oct 2008
Reroofing.
-
Jul 2009
Finish upgrades to existing restaurant. cosmetic storefront improvements, new glass, frp over existing gwp in kitchen gypsum wall bourn. removal and replacement in dining area. to comply with nov # 200990663. all code requirements to apply violation work, verify identified.
-
Oct 2009
Repair cracked cement footing, sheerwall, siding, painting, replace 4 doors and trim at rear storage structure, on the right to be repair.
-
Nov 2009
Install new fire suppression system to existing kitchen hood and duct. upgrade to comply with ul300.
-
Aug 2012
Change of use. install convinience store in vacant office space.
-
May 2013
Addition of new awning, demolition of old window system, demolition existing storefront security gate, clean & patch existing brick @ exterior. demolition existing stone veneer, below windows, if existingterrazzo savageable, clean, patch & repair. if not salvageable, install new brick veneer to match existing @ 5176 3rd st storefront. new.
-
May 2013
To paint non-structural sign.
-
Mar 2014
Repair dry rot wood pieces in rear deck; less than 50%.
-
May 2015
Demolish interior walls within a ground floor of a neighborhood commercial space. (nc-3). demolition of interior only, no exterior modifications. cap existing plmg fixtures to be remodeled on seperate permit. install new plmg hook ups for future t.i.
-
Dec 2015
Light discovery - prior to soft story upgrade, demolition at commercial space only - and restore. no removal of sheet rock on fire protection. open up footing for engineers review at front store & middle.
-
Apr 2016
Commercial: soft story retrofit per sfbc chatper 34b, plus add ada bathroom.
-
Apr 2016
Soft story upgrade, residential, per sfbc chapter 34b, 2012 iebc appendix a-4.
-
Oct 2016
Revision to 201604074217, 201604074216, 201505055426 - modify partition walls reconfigure space plan - add free standing office space.
-
Oct 2016
Title 24 electrical and mechanical for pa 2016-1013-0244.
-
May 2018
Renew for final 201604074217, 201604074216. all work complete.
-
Aug 2019
Vertical addition. modify existing garage and add 4 new dwelling units. maher n/a.
-
May 2024
Comply with awning amnesty 2 awings, gumbo social and one plain.
-
Jun 2024
Fire only: upgrade existing fire alarm system to comply with sffc section 1103.6.1.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update