2323 Cesar Chavez Street
Industrial building
-
1900
Built.
-
Aug 1992
Erect 20' communications tower on roof of building "a".
-
Nov 1999
Renew appln #9610574 & 9716354 for final only.
-
Feb 2010
Evr phase ii upgrade. fueling station evaporative vapor recovery system installation.
-
Jul 2010
Revision to 201002015667: evr phase ii upgrade. fueling station evaporative vapor recovery system installation.
-
Feb 2017
R&r existing dust collection equip in carpenters shop maher na. sprinkler work on deferred submittal.
-
Dec 2023
Scope is to add a new udact to the existing fire alarm system.
-
Apr 2025
Remove and replace existing fuel station located at sq ft operations yard. underground storage tanks will be removed and replaced with dbl wall tanks as req. also includes replacing e canopy, fluid storage area, back up generatior, new paving, storm drainage. no sidwalk or road closures.traffic not.
-
Nov 2025
Install 2 temporary fuel tanks ( 1 gas, 1 diesal) for fleet vehicle fuel.
-
Aug 2026
Instullation of oil, coolant, and def above ground tank systems to be installed in existing pumphouse.
15 expired or cancelled permits are omitted.