740 Earl Street
Bayview Hunters Point · San Francisco, CA 94124
Permit history
-
Sep 2001
Remove dry rot & replace with new standard grade lumber.replace (6) windows. no windows in front of ho.
-
Sep 2002
Install bathrm (accssble)& counter with sink; install new drywall remodel electrical contractor office at rear.
-
Mar 2004
Renew of permit application 200209257459.
-
Jul 2007
Repair fire damage to top level and roof; rework top level apts. no structural elements to be changed. no changes to grade level or bsmt; repair to roof system under separate permit.
-
Sep 2009
Rev. to p.a#2007/0719/7245. add dormers @ level 2 on earl st. & innes.
-
Jun 2010
Renovate studio apt at 1st floor, develop basement level into bedroom, and hall/utility rm. deck on existing concrete slab off basement level. rebuild level 2 roof and exterior walls. revision to 200909227371.
-
Aug 2010
To comply with nov 201057429 dated 07.15.2010 to legalize existing 5 dormer windows on 2nd floor residential which are being suspended under permit application 2009.09.22.7371.
-
Oct 2010
Revision to permit application 2010-0729-7751-r2-replace roof.
-
Jul 2013
To obtain final inspection for work approved under permit application 201008309819. all work is complete.
-
Jan 2014
To complete and finalize work approved under permit application 200707197245.
-
Jan 2014
To complete and finalize work approved under permit application 200909227371.
-
Jan 2014
To obtain final inspection for work approved under permit application 201007297751. all work is complete.
-
Nov 2014
To comply with nov #201190249. 1st floor: insulate and sheetrock & provide 2 hr separation between ceiling & floor between residence & retail ceiling below. all ground floor tenant space is vacant per ab-017. n/a for maher ordinance.
-
Feb 2015
Provide structural strengthing of existing 1st floor per building inspector request. (reference permit application 2010-0729-7751) per plan.
-
Jun 2015
Revision to permit application 2015.0205.7625 - alteration of foundation, n/a maher ordinance.foundation revision per plan - as built.
-
Jun 2015
Employee bath and breakroom, utility lights, electrical in vacant spaces. finish accessible bath, work on level 1 grade. existing recall space no change to exterior.
-
May 2016
To obtain final inspection for work approved under permit application 201307020991 & 2017411101092. all work is complete.
-
May 2016
To obtain final inspection for work approved under permit application 201401065673, 201401065675, & 201401065674. all work is complete.
-
Jul 2016
To obtain final inspection for work approved under permit application 2010-08-30-9819 and 2010-02-29-7751. all work is complete.
-
May 2017
To obtain final inspection for work approved under permit application 2015-06-01-7657, 2015-02-05-7625, 2015-06-08-8382. all work is complete.
-
Jul 2017
Revise story count from 3 stories(current) to "two story and 1 basement". show building consists of 2 dwilling units on the 2nd floor and 2 commercial spaces on the 1st floor. revision to app #2017-0509-6024.
-
Aug 2018
To obtain final inspection for work appoved under permit application 201401065673, 201401065675 and 201401065674. all work is complete.
-
Feb 2019
To obtain final inspecton for work approved under permit application 2014-1110-1092. all work is complete.
-
Feb 2019
To correcxt permit application 201605167517 which references 2017-1110-1092, should be 2014-1110-1092. all work is complete.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update