1135 Evans Avenue
Assessor class: vacant lot · Bayview Hunters Point
-
April 8, 2004
The City Planning Commission approved conditional use authorization to install a wireless telecommunications facility consisting of three panel antennas and a microwave dish on the existing 69-foot lattice pole.
-
Apr 2004
Cingular wireless proposes to establish and operate an unmanned wireless telecom facility consisting.
-
October 7, 2004
An existing 69-foot lattice tower stood at the property.
-
October 14, 2004
The City Planning Commission approved the conditional use authorization to install a wireless telecommunications facility consisting of 3 panel antennas on an existing 69-foot lattice tower.
-
Nov 2004
Slab on grade pour and tel co to slab with radio cabinets antennas to mount on existing pge pole.
-
Oct 2006
Install total of (3) 4'6" verizon panel antennas to be mounted on existing pg & e lattice tower.
-
Oct 2006
Erect wireless communication shelter.
-
Apr 2010
Verizon proposes to add three (3) new antennas on the lattice towers next to their existing antennas. add (6) runs coax approx 200'.
-
Oct 2012
Modification to an existing sprint cell site. consisting of adding a new mmbs cabinet, a new battery cabinet, a new ciena cabinet, a new uam cabinet, 3 new sprint antennas, 6 new rrus. 3 new tower mounts. a new gps antenna & 3 new hybrid cables.
-
Oct 2013
Remove 3 existing lte antennas from two individual p g & e towers & replace with 3 dual band lte / aws antennas, mounted at the same locations & the additional equipment installation of (3) remote radio units, (3) surge suppression units. (2) hybrid cables and (2) ret cables.
-
Aug 2015
Sprint: modification to an existing unmanned communication facility consisting (2)existing antennas & (2)existing rrm's adding 3new 2.5 ghz antenna, 3 new rrh-v3, 3new rrh-v3, 3new junction cylinders, 3new modules, 1new strung of batteries ins, existing bbu cabinet, new td-cte du with assoc breakers & rectifiacer existingmmbs.
-
Mar 2017
Replacing 270 feet of existing fence & replace the existing gate. new fench will be of non-conductive material chain link fence. 13 feet high including 1 foot barb wire.
-
Feb 2018
Install 3 new antennas, 6 rrh, junction cylinders & a string of batteries. relocate antenna & rrh.
-
Mar 2018
Installing stub and cap, installing 3" conduit. installing 4" coredrill, installing corrugated interduct with mule tape with allweather pull box. installing dark fiber trunks.
-
Jul 2018
Tmobile install 2 h frames install 2 antennas. install hybrid cables, relocate 2 antennas. all on tower.
-
Oct 2020
Modification to existing telecomm facility.relocating (2) antennas to new mounts, installing (4) new antennas, install (2) new cross arms, (2) new radios, (3) new hybrid cables, newbb6630 & new bb6648 inside existing cabinets, removing allexisting coax cables & existing tmas.
-
Jul 2022
Removal of cell site equipment including antennas, cabinets and cables, etc.
-
Aug 2022
Section 6409 modification to e verizon site. remove 6 antennas, remove 2 rrus-12 radios, remove preplace 2 raycaps and 2 hybrid cables. install 6 new antennas and 2 rru 8843 radios. remove 8 coax cables.
-
Aug 2022
Sprint has contracted velex to remove existing equipment, including electrical connections, off of the existing rooftop telecommunications site.
-
May 2023
T-mobile: remove existing mounts, cables & tmas, install 2 new h-frame mounts, install 2 new antennas & rrus, remove & replace baseband units from existing cabinets.
-
Jul 2023
Verizon project: install 2-mw dishes/2-odus, install 2-ballast mounts, 2-cat, 6-cables, 2-poe adapter boxes; existing cell site.
-
Jan 2025
T-mobile: remove & replace 2 existing antennas with 2 new antennas; 2 existing cabinets with 2 new cabinets, install batteries, install new 125a breaker.
1 cancelled permit is omitted.