Mar 1989
Repair fire damage, patch tile roof, replace sheetrock.
-
Apr 1992
Fire repair.
-
Jan 1994
Repair fire damage two rooms.
-
Feb 2004
Installa fire sprinkler system to comply with ord. #170-02.
-
May 2005
Closing in of 2 windows in fire spinkler equipment room to create an 1 hr enclosure window to be removed.
-
Jul 2005
Monitor new fire pump for sprinkler system.
-
Jun 2010
Demolish motel for 44 dwelling unit.
-
Jul 2010
Erect 73 dwelling units, 5 stories residential/parking building.
-
Nov 2011
Install shoring system with tiebacks along 3rd street & le conte avenue. ref permit application 2010/07/19/6949.
-
Apr 2012
Minor revision to approved permit application 201111048282. no work in the public right of way or on adjacent lots.
-
May 2012
Install underground fire service to building up to 5'-0 outside of building which will then meet the fire service. 8 inches underground- sprinklers under separate permit.
-
Aug 2012
Provide an automatic sprinkler system throughout the building & a class i standpipe system @ three stairwells. system designed as light hazard ordinary in garage. 1102 sprinklers total. ug was approved under permit application 2012-05-30-1447. swi 1/16/13.
-
Aug 2012
Installation addition of a new fire alarm system for the " mercy housing" building (low-rise).
-
Sep 2012
Roof truss deferred structural details for 201007196949-s1.
-
Sep 2012
3 interior metal stairs, deferred submittal for 201007196949-s1.
-
2013
Current structure built.
-
Aug 2013
Basement 1-5 and roof 22 evacuation signs.
-
Aug 2013
Basement 1-5 and roof. 22 evacuation signs.
-
Aug 2013
Revision to permit application 201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration.
-
Aug 2013
Addition of 73 duct detectors for new fso locations and 2 smoke detectors at door holders. all devices connect onto fire alarm system. pa ref#2013.0814.4281 (mechanical f/fsd additions).
-
2014
Bayview Hill Gardens, designed by David Baker Architects.
-
Feb 2014
Replace damaged drywall in three units, hallways, and 1st floor offices. reinstall existing appliances and new cabinetry. used 5/8" type x gyp bd. maintain 1 -hr rated separation between all units and hallways.
-
Feb 2014
Revision to 201402218995. at locations with wall board replacements, install insulation, replace v metal framing at drop ceilings two units, reinstall hvac ducting.
-
Sep 2018
Repair drywall, 32 sq ft of new insulation at trash room on 5th floor. damage to old insulation due to water leak. comply with complaint # 201889121 item 2.
-
Feb 2023
Emergency fire alarm control panel replacement; like-for-like replacement of all initiating devices.
-
Jul 2025
2nd and 5th floors: like in kind kitchen refresh @ studio units @ 15 units 2nd and 5th floors. cabinets, counter tops, appliances no floor plan changes.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34. 2 of them are nominal $1 street-space or sidewalk permits. This building's context statement dates the work 2014; the assessor's roll records the parcel as built 2013.