525 Phelps Street
Industrial building
-
1937
Built.
-
August 3, 1972
The M-1 property held a vacant building formerly used as a foundry, with a 50-foot rear yard on Galvez Avenue. The City Planning Commission approved, with conditions and by a 4-1 vote, automobile dismantling inside the existing enclosed building.
-
February 16, 1978
The City Planning Commission authorized, 4-2 and with conditions, an auto wrecking yard on the corner lot, relocated in part from Quint Street and Evans Avenue to make way for the City's wastewater construction, over the opposition of the Bayview-Hunters Point Community Coordinating Council (Resolution 7894).
-
Jan 1997
Addinterior walls of handicap ramp, ada bath, insulate windows.
-
Mar 1997
Fire sprinkler tenant improvement, drop 15 spklrs from pluged.
-
May 1997
Add 10 compact low bay hps c series fixtures in kennel area.
-
Oct 2002
Street space permit.
-
Sep 2007
Renew permit application 20000202920, #99197601, #200004127022 for final inspection.
-
Sep 2007
To renew for final only permit application 9912148, #200002111741 for final inspection.
-
Jun 2008
Renew permit application 9912148, permit application 2000/02/11/1741, permit application 2007/09/28/4092 & permit application 2007/09/21/3331 for final inspection only.
-
Aug 2009
Provide new service door and replace 2 man doors and add ribbon windows (not visible from street) at rear yard. new windows and doors are into unconditioned space.
-
Dec 2009
Renovation of existing approx 1000 sq ft lobby space, ada upgrades of existing toilet (restroom), new glazing.
-
Mar 2010
Sprinkler waterflow and supervisory system.
-
Apr 2010
Deletion of scope #200908205231. overhead door to be inserted within existing steel column opening. no widening of steel or new adhesive anchors. remove special inspection 2 bolts installed in concrete and 5 welded studs under permit application 201004120051.
-
Oct 2017
Remodel existing warehouse space with new retractable roof, new windows @ phelps st facade. new polycarbonate wall @galvez st facade. extend fire sprinkler where required @ new rooms - sprinkler under separate permit.
-
Mar 2018
Soft demolition per ab-017. demolition existing mezzanine and first floor partition walls, dog pool, and ramp, chip out concrete, sandblast as noted. exploratory demolition at slab to locate underground plumbing. n/a for maher.
-
May 2018
Ref pa 2017-1026-2311 - structural work throughout animal-care facility. change from metal to wood frame. update egress diagram. n/a for maher.
-
Oct 2018
Install fire sprinklers for new retractable roof, (sidewalls generally)add sprinkler in several areas to bring system up to code- per nfpa 13- hydro required. 55 new heads.
-
Mar 2019
Revision to pa 2017-1026-2311 change door swing at existing ramp.
-
Jun 2019
As built plans for original permit# 201810183512 sidewall line was omitted from the job. n/a for maher.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline. 6 expired or cancelled permits are not shown.