1922
Built as St. Joan of Arc Roman Catholic Church and School for the district's French and French-Canadian population, who had worshipped until then at an earlier St. Joan of Arc on La Salle Avenue, put up for the French immigrants working in the meat packing plants and tanneries of Butchertown. In 1949 the congregation built a new church on the opposite side of Lane Street; this building is no longer in use as a church.
-
Jan 1991
Add elevator partial seismic strengthening, add n/sprkl sysm.
-
Apr 1991
New fire sprinkler system.
-
May 1991
Underpinning foundation columns as requested by inspector.
-
Aug 1991
Remove approx. 44 sq ft. of stucco.
-
Aug 1991
Reroofing.
-
Sep 1991
Furnish & install (1) pyrochem 2.40 gallon.
-
Oct 1991
Provide one enclosur for elevator.
-
Apr 1992
For final inspection re appn. #9108219.
-
Oct 1992
Install iron fence and landscaping.
-
Nov 1995
Removeexistinggarage(1/f for childcare 2/f for office add 324 sq ft.
-
May 1997
Alter existing sprinkler system, add 4 heads on 2nd floors.
-
Jul 1997
Install addtion 2 horns & smoke detectors to existingfire alarm.
-
Aug 2006
Drywall & trim repair as a result of a sprinkler head discharging. electric will be meged to ascentain continuity. repair only. no changes to be made.
-
Feb 2015
Reroofing.
-
Apr 2017
Fire alarm system: replacement & upgrade due to elevator modernization. replace e() control panel, s/d & pull stations with new at same locations. install new monitor mods for sprinkler devices & ansul syst, relays for elev recall. new sounders, tie into existing.
-
May 2017
As builts to 201704053255. remove smoke detector from common area, except for elev recall. add smoke and heat det to elev hoistway. remove ansul montoring from system not installed.
-
Sep 2018
Replace existing exterior wood windows, 21 total. replace in-kind. same size. same location. m= 0.32 max.
-
Jun 2019
Renovation. ada barrier removal and deferred maintenance repair. prop-up wooden fence. repair and replace bathroom fixtures in-kind on basement level. existing heating system to remain.
-
Nov 2019
Administrative permit to revise permit application 201906193909, remove all scope of work in basement level and 2/f, maintenance noly, all plumbing fixtures are replaced in-kind, update da checklist.