3844–3846 19th Street
Castro (Eureka Valley) · San Francisco, CA 94114
Permit history
-
Aug 2023
Residential remodel of one kitchen and one bathroom along with full electrical rewire of unit. no structural work. all work at one unit.
-
Aug 2020
Remove existing hvac unit in garag. replace with new carrier performance series heat pump. move all necessary electrical, water/drain line and vents as needed. no structural work, no new walls. existing wall to remain.
-
Oct 2013
Remodel kitchen and bath. new cabinets, flooring, plumb, electrical, new vanities, shower enclosure tile, doors, sheetrock, finish carpentry. complete rewire for electrical, reroute drains and water lines in kitchen for corner sink, move gas hvac where nec. no structural.
-
Apr 2009
Remove and replace 3 windows, no change in locatin and rough openings. wood existing, vinyl proposed u valve =.34. no windows face the street.
-
Jan 2001
Reroofing.
-
Aug 1997
Remove and replace window sash as per nov.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.