Apr 2014
Work to be done in one unit - revision to appl. 201311010866. revise structural details.
-
Mar 2014
Amendment to app#201402269390 to address wood rot found. need to pour 4' grade beam to support non load-bearing wall. instead of replacing existing tub, will build walk in shower.
-
Feb 2014
Condo conversion in progress. want to replace existing ground floor bathroom window (approx 30"x20") with smaller window (approx. 24"x18") with tempered glass. also want to add sliding glass door to existing tub (to be replaced by identical standard tub).
-
Nov 2013
To comply with physical inspection report cc-7336, obtain approval for rooms down, remove existing kitchenette at 1/f., legalize existing steel beams and columns at 1st floor.
-
Apr 2008
Remove existing cpr vents, remove & replace sidings, concel porch light switches & light boxes. replace cpr plumbing vents, paint.
-
Jan 2007
Comply with nov# 200672451: file building permit to re-construct decks at two levels located at the rear of property. same configuration and dimension as original.
-
Dec 2006
Replace 5 windows, & 1 door. size for size. aluminum to wood composite. not visible from street. u-valve 0.39.
-
Oct 2005
Interior remodel, 1 kitchen, 2bathrms, new beam. existing footing below beam shown on permit app#8924859.
-
Jun 2005
Remove existing roof and new tar and gravel roof.
-
Dec 1989
New concrete footings to replace existing footing.