74–78 Belcher Street
Castro (Eureka Valley) · San Francisco, CA 94114
Permit history
-
Aug 2025
Interior remodel of one unit only: existing kitchen and bathroom remodel, add one bathroom, add closets to two bedroom. no change to other units nor the building. envelope work at top floor, front building only.
-
Aug 2025
Window replacment: replace alll existing windows in unit with aluminum-clad windows for street-facing and vinyl windows for non-street facing. all new windows to have u-factor less than or equal to 0.30. work on top floor, front building only. modify water closet toilet location and add sink.
-
Oct 2002
Install handrails on backstair.paint.replace of risers & threads. replace in kind. all wood should b.
-
May 2002
Demolition sheetrock 3ftx3ft area.reframe tape paint replace 5ft gas pipe.
-
Mar 1997
Reroofing.
-
Jul 1985
Replace outside back stairs handails to 2nd floor paint.
-
Jul 1984
Replace outside backstairs handrails to 2nd floor and paint.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.