155 Caselli Avenue
Castro (Eureka Valley) · San Francisco, CA 94114
Permit history
-
Sep 2019
To comply with nov#201950211. 1st floor: convert storage to home office and install gas wall furnace approx. 395 sq ft. 2nd fl: remodel existing kitchen and bathroom, legalize bathroom. 3rd fl: 2 skylights, replace existing wood stringer and post stair way to steel post and stringer.
-
Jan 2019
Reroofing.
-
Nov 2018
Replace 10 windows with renewal by andersen casement windows on front and two side elevations, wood composite frames, (5) windows street facing.
-
Mar 2018
Remove plaster in (1) bedroom, replace with drywall.
-
Sep 2015
Replace rear patio sliding door - like for like.
-
Dec 2011
Interior remodeling incl new ktichen & bath fixtures & finishes, new bath on 2nd floor, new finishes as req to integrate new work, remov eexisting vinyl siding, repair stucco @ front, repair existing wood sidings as req at rear, replace all windows with marvin integrity windows, add skylights.
-
Oct 2000
Install vinyl sidinsg entire building.
-
Oct 1988
Install aluminum windows.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.