224 Caselli Avenue
Castro (Eureka Valley) · San Francisco, CA 94114
Permit history
-
Nov 2022
Replace front window @ ground fl level with a dual glazed slidimg wood aluminanum clad marvin or equivalent window in existing opening.
-
Jul 2022
Add simpson urfp retrofit foundation plates, 3 on south side and 3 on west side at sw corner of front. add 3/8" plywood for shear strength, 6 inch e.m. remove sheetrock as needed. replace with 5/8 inch type x.
-
Apr 2019
Removes and replace 16 linear feet of kitchen counter and 14 linear feet of wall cabinets.
-
Feb 2019
Remove/replace interior garage concrete slab in-kind, 1/2 rebar every 14 on center with 4"3/4 drain rock with 10 mill visqueen over 2" sand with new 4" thick concrete, min 2500 psi.
-
Aug 2018
Replace <50% of front stair wood construction replace in-kind.
-
Jul 2002
Replace e retaining wall at rear property line per plan.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.