CPMC Davies
45 Castro Street · Eureka Valley
-
1878
The German General Benevolent Society opened the German Hospital on this block, a 200-bed wood-frame building in the German Rundbogenstil on a campus of grass, palms and shrubs. A women's wing followed in 1888.
-
1881
The site had been in health-care use for 110 years by 1991, placing the first hospital use here in about 1881.
-
November 23, 1906
Cyclops Iron Works, Pacific Coast Cork Insulating Company and New Century Dish Washing Machine Company contracted for a refrigerating and ice-making plant at the German Hospital, which then stood on this block, at $3,780.
-
1908
The original hospital was replaced by a five-storey brick complex facing 14th Street, renamed Franklin Hospital during World War I.
-
1965
Work began on the medical centre buildings then standing, and every building, fence and roadway of the earlier hospital was razed for them.
-
1966
Built.
-
1966
The board launched a $12 million campaign to rebuild the aging campus with two towers and an office building at the northwest corner of the site.
-
1968
The three new buildings were completed and the old Franklin Hospital demolished; the hospital was renamed Franklin Medical Center.
-
1969
The medical center's Medical Office Building at Castro and Duboce was completed and fully occupied.
-
1972
Renamed Davies Medical Center, for the longtime board member Ralph K. Davies.
-
September 7, 1972
The site proposed for a ground-level helicopter landing pad was the Ralph K. Davies Medical Center (Franklin Hospital) parking lot on 14th Street. Franklin Hospital, the Ralph K. Davies Medical Center, owned and occupied an entire square block, on which it had recently rebuilt its facilities, with its emergency operating rooms on the ground floor. The City Planning Commission approved, for a six-month trial period and with additional conditions, a conditional use for an emergency helicopter service at Franklin Hospital.
-
September 14, 1972
The City Planning Commission ruled that the hospital's six-month helipad authorization would run from the completion of the helipad, and asked the hospital to proceed promptly.
-
January 12, 1978
The City Planning Commission certified the final environmental impact report for the expansion of Ralph K. Davies Medical Center (Resolution 7879) and then unanimously disapproved its conditional use application to add a fifth floor to the hospital for enlarged executive offices (Resolution 7880).
-
1980s–1990s
The medical center played a critical role in the treatment of people with HIV and AIDS.
-
Sep 1991
Remove existing atm.
-
Sep 2003
Medical suite on second floor-walls, doors, cabinets, electrical+plumbing & public facilities upgrade.
-
Oct 2003
2nd tenant suite deve removing toilet room &const new accessible toilet-doors, walls, cabinets, electrical&pl.
-
Jul 2005
Construction of new exam room, office staff room, reception desk, replacement of casework, paint.
-
Sep 2006
To erect a new 1 story trailer for use as medical/outpatient clinic.
-
Mar 2011
Access barrier removal at curbs, parking and egress door. all work is on private parking, no work on public way.
-
Apr 2012
Interior remodel of office/exam spaces in suite 220-238 davies medical office building for brain health center.
-
Nov 2013
Voluntary access barriers removal involves upgrade sanitary facilities, elevators, door hardware, handrails, signage & audio visual fire alarm devices.
-
Nov 2014
Reroofing.
-
May 2015
2nd floor: suites # 200/215, 220, 238 - expansion & remodel of existing sutter heatlth ctr. selective demolition & new partitions, doors & ceilingd. moving existing accessible restroom to new locations & modifications to existing hvac, plumbing & electrical systems. life safety deferred. maher na.
-
Jun 2015
Ti- remodel existing procedure room & recovery room. work includes arch & mep. maher na.
-
Apr 2018
Remove wall between reception and waiting room make (2) existing exam rooms into (1) access exam room enlarge storage into office new finishes throughout.
-
Jun 2018
Combine existing suites 415 & 418; remove wall between existingexam & existing reception to add business office, add new accessible exam room, relocate reception, expand existing toilet to be accessible, add new make-up room, and reconfigure existing exam 4 into new accessible exam / treatment room. n/a for maher.
-
Sep 2019
Add new accessible toilet, new accessible procedure room add new floor finish, paint, new light only in procedure room & toilet.
-
Oct 2023
Selective demolition in suites 220, 212, and 207 to accomdate the proposed tenant improvements. converting existing consult room and existing offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel existing suite 212 to 5 neuropsych offices, and admin. modify existing hvac, plumbing, and electrial systems.
-
Dec 2023
4/f - suite 421: barrier removal. work consists of: wait area 421, replace, reverse swing dutch door to single solid door to meet ada standards and path of egress, reception area 421, remove existing counter and replace to accommodate ada height requirements. exam room 421d: widen doorway.
-
Jun 2024
4th floor- ceiling tiles are being demolition to gain access above ceiling. remove and replace heating hot water coils with like for like replacements as well as installing new control dampers for cav mechanical system and clean ductwork. ceiling tiles to be replace.
-
Jul 2026
Voluntary barrier removal campus improvement, roadway resurfacing, site regrading and signage modiifcations, providing ada compliant access between the medical buildings and parking garage. reloate/ reinstall an existing pay station with an install of new canopy outside of the parking garage, minor modificat.
DBI holds 74 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 74. 14 of them are nominal $1 street-space or sidewalk permits. 7 expired or cancelled permits are not shown. Sources disagree on the campus's construction dates: the assessor's roll gives 1966, the Duboce Triangle context statement says the three new buildings were completed in 1968, and the medical center's development-plan report gives 1969 for the Medical Office Building.