1878
The German General Benevolent Society opened the German Hospital on this block, a 200-bed wood-frame building in the German Rundbogenstil on a campus of grass, palms and shrubs. A women's wing followed in 1888.
-
1908
The original hospital was replaced by a five-storey brick complex facing 14th Street, renamed Franklin Hospital during World War I.
-
1966
The board launched a $12 million campaign to rebuild the aging campus with two towers and an office building at the northwest corner of the site.
-
1968
The three new buildings were completed and the old Franklin Hospital demolished; the hospital was renamed Franklin Medical Center.
-
1972
Renamed Davies Medical Center, for the longtime board member Ralph K. Davies.
-
1980s–1990s
The medical center played a critical role in the treatment of people with HIV and AIDS.
-
Sep 1991
Remove existing atm.
-
Mar 1992
Erect a one story parking structure.
-
Jun 1997
Vertical addition.
-
Sep 2003
Medical suite on second floor-walls, doors, cabinets, electrical+plumbing & public facilities upgrade.
-
Oct 2003
2nd tenant suite deve removing toilet room &const new accessible toilet-doors, walls, cabinets, electrical&pl.
-
Jul 2005
Construction of new exam room, office staff room, reception desk, replacement of casework, paint.
-
May 2006
Erect 4 stories medical office & clinic.
-
Sep 2006
To erect a new 1 story trailer for use as medical/outpatient clinic.
-
Dec 2006
T.i. for office space, demolition, new partitions/finishes. no street space or debris box on public street. accessibile restrooms approved for appl#200309225357.
-
Jan 2010
Disabled access barrier removal. install (n0 door @ open garage ext.screen, installation of 4 new curb ramps ( on site), repaving asphalt drive, re stripping & tactile warnig installation of parking and on-site crosswalks, and related accessible signage.
-
Mar 2011
Access barrier removal at curbs, parking and egress door. all work is on private parking, no work on public way.
-
Jul 2011
Roof, 1st to 4th floors-renovation of 2 existing toilet rooms into 2 hc accessible toilet rooms, incorporation of new i.t. rooms (2) into availble area. installing associated mechanical, electrical equipment.
-
Dec 2011
At building 4. demolish existing therapy pool & equipment replace with new. build a new external pool equipment room. provide accessible showering toilet & changing facilities. to provide other accessible features. legal owner is west bay regional hospital-doing business as cpmc.
-
Apr 2012
Interior remodel of office/exam spaces in suite 220-238 davies medical office building for brain health center.
-
Nov 2013
Voluntary access barriers removal involves upgrade sanitary facilities, elevators, door hardware, handrails, signage & audio visual fire alarm devices.
-
Nov 2014
Reroofing.
-
May 2015
2nd floor: suites # 200/215, 220, 238 - expansion & remodel of existing sutter heatlth ctr. selective demolition & new partitions, doors & ceilingd. moving existing accessible restroom to new locations & modifications to existing hvac, plumbing & electrical systems. life safety deferred. maher na.
-
Jun 2015
Ti- remodel existing procedure room & recovery room. work includes arch & mep. maher na.
-
Apr 2018
Remove wall between reception and waiting room make (2) existing exam rooms into (1) access exam room enlarge storage into office new finishes throughout.
-
Jun 2018
Combine existing suites 415 & 418; remove wall between existingexam & existing reception to add business office, add new accessible exam room, relocate reception, expand existing toilet to be accessible, add new make-up room, and reconfigure existing exam 4 into new accessible exam / treatment room. n/a for maher.
-
Sep 2019
Add new accessible toilet, new accessible procedure room add new floor finish, paint, new light only in procedure room & toilet.
-
Oct 2023
Selective demolition in suites 220, 212, and 207 to accomdate the proposed tenant improvements. converting existing consult room and existing offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel existing suite 212 to 5 neuropsych offices, and admin. modify existing hvac, plumbing, and electrial systems.
-
Dec 2023
4/f - suite 421: barrier removal. work consists of: wait area 421, replace, reverse swing dutch door to single solid door to meet ada standards and path of egress, reception area 421, remove existing counter and replace to accommodate ada height requirements. exam room 421d: widen doorway.
-
Jun 2024
4th floor- ceiling tiles are being demolition to gain access above ceiling. remove and replace heating hot water coils with like for like replacements as well as installing new control dampers for cav mechanical system and clean ductwork. ceiling tiles to be replace.
-
Jul 2026
Voluntary barrier removal campus improvement, roadway resurfacing, site regrading and signage modiifcations, providing ada compliant access between the medical buildings and parking garage. reloate/ reinstall an existing pay station with an install of new canopy outside of the parking garage, minor modificat.
DBI holds 74 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 74. 14 of them are nominal $1 street-space or sidewalk permits.