Permit history
-
Oct 1984
Give accoust ceiling, toilet, electrical. service, doors revision.
-
Apr 1985
New concrete ramp to provied barrier free access to grd floor.
-
Jun 1986
New warm air heating system to replace existing old heating.
-
May 1987
Alter mechanical room to create new storage closet.
-
Jul 1987
Light fixture replacement, toilet stall, acoustic tile, etc.
-
Feb 1988
Installation of folding partition (2) with track.
-
Jan 1994
Meet parapet safety program compliance.
-
Apr 1994
Convert existing area to 300 sq ft and resource rm new partitions.
-
May 2004
New fir alarm sytem. note buiding will under go sprinkler system install, at the same time, under**.
-
Jun 2004
Add new fire sprinkler system to building.
-
Mar 2009
Renew permit application 8504417 to obtain final inspection. all work has been completed.
-
Mar 2009
Renew permit application 8710826 to obtain final inspection. all work has been completed.
-
Apr 2009
Playground improvements, water trough. new sink in art studio in basement, remove office wall, replace bath stalls for barrier removal. provide 2 handicap stalls, and restripe parking, alter kitchen for accessibility, replace toilet partitionsin boys toilet for accessibility, replac fire ext, cbinets.
-
Jul 2009
Fire sprinkler ti, add 1, relocate 2.
-
Jul 2009
Revision to permit application 2009.04.30.7400. install concrete ramp and handrails by removing existing concrete paving and replace with new accesible ramp. replace existing gate ( front/side) with accesible gate per plan.
-
Jul 2009
Relocate (2) strobes because of bathroom addition. no drawing are needed per lt. don fields. reference to permit application 2009-0430-7400.
-
Jun 2014
B/f - tenant improvement: demolition 2 non load bearing walls, reroute electrical, add drain lines and add 2 sinks, install carpet & sheet vinyl, install storage/cabinets, patch & paint.
-
May 2019
Abatement of asbestos per haz mat report dated 8/30/88. includes removal of contaminated materiasl and replacement where asbestos is present in basement level and the stairwells.
-
May 2019
Structural strengthening of 2 basement walls & associated footings. 2 proposed nonstructural 1 hour rated partitions to replace existing non-structural partitions. reroofing. new skylight. accessibility upgrades including parking lot accessible stall restriping & path. nw exterior stair.
-
Jan 2020
Window replacement. 78 windows. retrofit. no changes.
-
Jun 2020
Interior tenant improvement @ the basement level. work includes new non-structural partitions, (1)new pre-k restroom, & new flooring @ area of work. scope of work also includes installation of new 48" high fence in yard.
-
Sep 2020
Fs for basement: installation 3 sidewalls at e fire sprinkler system 201905079993.
-
May 2022
Partial wall. relocate 2 entry door. install 2 windows. demolition & hawling walls 2nd fl.
-
Jul 2022
Install 2 single doors, different sizes, glass window tempered. install one more sink. install new heat pump heater. revision to 202205134180, remove existing furnace.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27. 2 of them are nominal $1 street-space or sidewalk permits.