140 Dolores Street
24-unit apartment building · Eureka Valley
-
1963
Built.
-
Feb 1993
Repair dry rot in garage ceiling. cover with 1hr 5/8 board.
-
Jun 1995
Reroofing.
-
Sep 1995
Repair dry rot on roof stairway walls.
-
Jul 2000
Dry rot repair and street space.
-
May 2001
Exist cantalevered deck to be repaired in conjunction with on going dryrt repair revsn 200007276287.
-
Jul 2001
Dry rot repair, new windows, water proofing (not visible fr street.
-
Nov 2001
Revuild existing deck due to dry rot damage (4 deck total).
-
Jul 2002
Remove existing kitchen cabinets, new kitchen cabinets and counter.
-
Jun 2003
Window replacement east side of bldng (dolores st) minor dry rot repair.
-
Jan 2004
Remove & replace kitchen cabs & counter, remove existing bath fixtures.retile tub area.no struc wall.
-
Apr 2005
Replace kitchen cabinets. replace bath medcine cabinet &vanity.
-
Mar 2006
Replace kitchen cabinets, bath tiles, bath vanity, bath medicine cabinet.
-
Apr 2006
Replace kitchen cabinets. replace bath vanity. replace tiles in bathroom. replace medicine cabinet.
-
Jul 2008
Work @ one unit only. replace kitchen cabinets. replace wall tiles in bathroom. replace vanity & medicine cabinet.
-
Dec 2008
Work @ one unit.kitchen remodeling. replace kitc. cabs & countertips. bath remodeling. replace vanity, tiles. all non structural.
-
Jul 2009
Work on one unit - repalce kitchen cabients, replace bathtub & tiles in bathroom, replace bath vinity & medicine cabinet. provide high efficiency lights per title 24 mandatory measures. electrical & plumbign on separate permits.
-
Jul 2009
One unit - replace kitchen cabinets, replace bathtub & tiles in bathroom. provide high ellicency lights per title 24 mandatory measures, replace bath vanity & medicine, cabinet, plumbing & electrical permit under separate permit.
-
Nov 2009
One unit - kitchen remodeling: replace cabinets, counter top, appliances & faucet. upgrade electrical. no walls move. provide min. 50% kitchen light watts in h.e. lights.
-
Mar 2011
Replace framing damaged from vehicle accident, replace 2 garage doors, repair/replace approximately 15 sq ft. of stucco.
-
Sep 2011
#108- replace kitchen cabinets, 50% high efficacy lighting, replace bathroom tile, 100% high efficacy lighting, replace bath vanity, replace medicine cabinet.
-
Jan 2013
#304- replace kitchen cabinets & countertops, replace bathtub & bath tiles, replace vanity & medicine cabinet.
-
Aug 2014
#102. replace kitchen cabinets & counter tops, replace tub & tiles in bathroom. replace vanity cabinets. lighting to comply with cec 150(k). no change with location.
-
Jan 2015
Reroofing.
-
May 2015
One unit: replace bathroom tiles, replace bathtub, replace vanity.
-
May 2016
Soft story retrofit per sfbc chapter 34b. engineering criteria 2012 iebc appendix a-4.
-
Jul 2017
Reroofing.
-
Sep 2017
Work in one unit: one kitchen and one bath remodeling.
-
Nov 2018
Remove 50sq ft of stucco and repair. damage wood, not visible from street.
-
Dec 2018
One unit: one kitchen and one bathroom remodel. no new wall and no existing wall relocation. all plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0 (k)3 and (k)5.
-
Jan 2019
One unit: kitchen and bathroom remodel. approx 10x8, no change in walls and opening and layouts.
-
Dec 2019
One unit: kitchen and bathroom remodel. approx 8'x10'kitchen, 5'x7'bathroom.
-
Mar 2020
One unit - kitchen and bath remodeling, 1 shower pan.
-
Dec 2020
One unit: kitchen & bath remodeling, no change to structure.
-
Nov 2021
Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1.
-
Dec 2021
Common area: leaking vinyl window repair/troubleshoot. will need to open small section of stucco for this. rear of building only. then repair stucco after. estimate approx 60sf of stucco may need opening. two windows only.
-
Jul 2022
One unit: replace kitchen counter and faucets: keep existing kitchen cabinets: no work in the bathroom: update electrical wiring and panel in the unit.
-
Jul 2022
One unit. replace kitchen counter and faucet. keep existing kitchen cabinets. replace appliances. no work in bathroom. update electrical wiring & panel in the unit. no change to layout, wall, structural wall, windows or door.
-
Feb 2023
Remove existing balcony tile flooring to repair leak approx 20x25 and repair stucco after deck work is completed.
-
Jul 2025
One unit: new kitchen countertop over existing kitchen cabinets. full (1) bathroom remodel following same existing layout. update electrical in the unit and update the sub-panel in the unit.
1 nominal $1 street-space permit and 1 expired permit are omitted.
Nearby
- 139–143 Dolores Street Same street
- 144–148 Dolores Street Same street
- 126 Dolores Street Same block
- 120–124 Dolores Street Same block
- 150 Dolores Street Same block
- 114–118 Dolores Street Same block
- 32 Hidalgo Terrace Around the corner
- 636 14th Street Around the corner