Mar 1982
Additions alterations or repairs.
-
Aug 1982
Building use: offices.
-
Sep 1982
Building use: bank.
-
Oct 1982
Additions alterations or repairs.
-
Apr 1983
Install new steel framing & concrete footings.
-
Aug 1985
Install new windows, remove non-bearing partitions.
-
May 1988
New non/bear partitions, casework, lockers, flooring, carpet.
-
Sep 1988
Tenant improvement of upper lvl only.
-
Nov 1988
Add new atms revise enclosures.
-
Jan 1989
Install 6 air cond. units on roof with economicers.
-
Oct 1990
450 sq ft of improvement new window door entry, flooring.
-
May 1995
T/i work, except for elevator & van access parking.
-
May 1995
See app #9507151 for t/i work, elevator & van access parking.
-
Jun 1996
To legalize atm's installed, bituce of violation #8802942.
-
Feb 1997
New foundation drains, 8 dewatering drain in garage slab.
-
Feb 2007
Accessory use to existing fitness club; millwork; sinks and plumg connection; electrical for equipment; reuse existing; revise existing mechanical. no change to building exterior.
-
Feb 2011
Non-structural int. tenant improvement of exist. small rest space. construction to include non-structural partition, equip installation & finishes. (this rest (b-occ) shares space with gold's gym (a3). building not sprinklered. 2-hour f.r. separation req'd unless sec. 508.2.1 conditions are met.
-
Nov 2013
Change of use. vacant retail vitamin store to be converted to coffee shop (restaurant limited).
-
Apr 2015
Creat patio for commercial coffee shop at cornner of site: new concrete slab on grade, glass wind screen 6'-0" of ht & seating. n/a for maher ordinance.
-
Dec 2020
Demolition damaged columns, storefront & glazing; install new columns, repair & replace storefront system.
-
Jan 2021
2/f group studio: demolition existing interior non bearing partitions, doors, frames, hardware, flooring and ramp. finish improvements to include new flooring to match level and finish. new infill partition at existing door opening, finishes to existing.
-
Dec 2022
Adding (13) recessed lights, move (1) sink, adding dry wall soffit for cosmetic look. no walls or layout changes.
-
Mar 2024
Demolish the existing mens shower & steam room and replace with new showers, floor tile and light fixtures.
-
Aug 2025
Remodel locker configuration, add saunas, remodel lighting, remodel women's locker room shower layout.