408 Roosevelt Way
Castro (Eureka Valley) · San Francisco, CA 94114
Permit history
-
Feb 2022
Replace the planter concrete retaining wall in kind due to cracking.
-
Jun 2019
Reroofing.
-
Jun 2009
Woluntair anchorbolt retrofit: install anchorbolts at 4' intervals in existing perimeter foundation. anchors to be 5/8" x12" threaded or with 2" square washers, epoxy set with 7" embedment minumum. construct plywood stiffening panels on existing basment walls, panels to be 1/2 cdx plywood, nailed.
-
Mar 2001
Remodel existing 2nd floor bath and closet areas into 2 baths of reconfigured closets.
-
May 1996
Reroofing.
-
Sep 1988
Repair termite, extending foundation wall.
-
Apr 1988
Remodel kitchen & laundry.
-
Oct 1985
Remove & replace exist post & pier, install rat proofing.