359–363 Waller Street
Building · Eureka Valley
-
1905
Built.
-
Oct 1988
Installation of 2 used cheney stairway.
-
Dec 1993
Reroofing.
-
Jun 2002
Dry rot in kitchen & bathrm, floors in one unit, repair floor sheathing.
-
Dec 2005
Repair & replace kitchen cabinets & s inks.repair & replace bathroom cabinets & fixtures.work on all 6 units.no structural work.
-
Mar 2006
Repair dry rot in light well in kind.
-
Dec 2006
New 2nd floor deck over 1st floor roof.
-
Feb 2007
Renew app #200512130199 and 200603166788 for final inspection.
-
May 2007
Renew for permit application 2006/12/08/9496. (existing deck).
-
Sep 2013
Enlarge and remodel kitchen, remodel existing bath and laundry to master bath and powder/laundry, remodel existing guest bath, add/change existing skylights in living room and kitchen, remove closets in family room, new lighting.
-
Jun 2015
To obtain final inspection for work approved under pa200206149101. all work is complete.
-
Jun 2015
To obtain final inspection for work approved under permit application 200612089496. all work is complete.
-
Sep 2015
Replacing 11 windows on waller st with wood clad windows replacing 6 windows on germania st with wood clad windows. waller side replace with aluminum wood clad hung on 2nd floor, awc sliders on lower. germania st side replace with aluminum wood clad sliders. same size same locations. u-factor < 0.32.
-
Jun 2016
To comply with physical inspection report #cc-7806.
-
Jun 2016
Like for like voluntary fire system replacement with new control unit, heat detectors and pull station at same location. 2 exist. bells will be tie in to new control unit. there is no record for previously installed system.
-
Jul 2016
As builts to pa 2016-0627-0969, remove heat detectors, show one smoke detector above panel.
-
May 2017
One unit: new powder room & closet, new wall cabinetry, new kitchen counters and one base cabinet. no increase to building height, area or foot print. no work visible from street.
-
Aug 2017
One unit: work on 1st fl. construction of new non-load bearing partition for new bedroom. resulting in reconfiguration of ceiling lights. unsealing at existing masonry fireplace.
-
May 2019
One unit -bathroom in an existing walk in closet of 6 unit condo.
-
Mar 2021
Reroofing.
-
Nov 2021
At germania street facade- remove shingle siding and replace with new shingles.
-
Nov 2023
#5: creating 2nd bathroom with water closet, shower, and lavatory. replace glass sliding door in kind. new skylight. no deck work.
-
May 2024
Remove and replace existing damaged shingle siding south frontage exterior wall. replace with wood horizontal siding exterior paint same. roof repair.
-
Aug 2024
Reroofing flat roof portion.
6 nominal $1 street-space or sidewalk permits are omitted from the timeline. 1 cancelled permit is not shown.
Nearby
- 348–352 Waller Street Same street
- 371 Waller Street Same street
- 52 Germania Street Same block
- 70 Germania Street Same block
- 345–349 Waller Street Same block
- 74–76 Germania Street Same block
- 143–147 Fillmore Street Around the corner
- 106 Germania Street Around the corner