37.7947, −122.4004 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0229, Lot 020 · ZIP 94111

333–375 Battery Street

Hotel · Chinatown

  • 25 stories
  • 281,581 ft2
  • 15,450.75 ft2 lot area
  • 360 residential units
  • 360 rooms
  • 374 bathrooms
  • Zoned C3O
  • Not a historic resource
  • Sold September 3, 2021
Land$130,528,584
Improvements$87,019,056
Fixtures$2,786,950
Total assessed$220,334,590
37.7947, −122.4004 Street View appears here once a Google Maps embed key is configured.
  1. Sep 1980
    Filing Permit 8008153 $$$ $63,800

    Additions alterations or repairs.

  2. Jun 1983
    Permit 8305676S $$$ $47,600,000

    New construction.

  3. 1988

    Le Méridien, formerly the Park Hyatt, designed by architect John Portman.

    Architecture, Planning & Preservation Professionals: A Collection of Biographies, adopted 2021
  4. 1989

    Assessor’s “built” date.

  5. Feb 2009
    Permit 200902021210 $$$ $61,000

    Disabled access barrier removal, new accessible entry doors, directional signage, accessible counters at bar, registration desk andconierge, lighting replacement at porte corchere.

  6. Jul 2010
    Issued Permit 201007237297 $$$ $117,500

    Disabled access barrier removal at 3rd floor toilet rooms sixteen guest rooms.

  7. May 2012
    Permit 201205231066 $$$ $40,000

    Barrier removal at four e publice toilet rooms serving e common areas. no additions. mechanical, plumbing, electrical, lighting to be design build under separate permit. barrier removal work under this permit at basementf and 2nd floor only.

  8. Sep 2012
    Issued Permit 201209190088 $$$ $618,908

    Interior renovation of existing lobby, bar, office and business center at lobby level fully sprinklered existing. fire and life safety (deferrd).

  9. Nov 2013
    Permit 201311061232 $$$ $25,000

    Interior renovation of single existing top floor guest room. suite including new parttions, finishes, fixtures, and lighting. no exterior work.

  10. Aug 2014
    Permit 201408184018 $$$ $200,000

    5th thru 24th floor - renovation of 12 accessible guestrooms & bathrooms, miscellaneous partition removal in non-accessible rooms n/a maher ordinance.

  11. Dec 2021
    Permit 202112023520 $$$ $10,000

    5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry.

  12. Aug 2022
    Permit 202208170750 $$$ $600,000

    Level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mechanical, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).

  13. Aug 2022
    Permit 202208261359 $$$ $400,000

    Basement c: expansion of existing fitness center, new finishes, mechanical & lighting. basement b & level 2: new finishes, retrofit lighting at existing prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.

  14. Dec 2022
    Permit 202212138174 $$$ $1,775,000

    The project scope include: level 3. renovation of existing public restrooms, renovation of existing restaurant and bar, new reception louge and coffee bar. renovation of existing outdoor patio with new outdoor bar, concrete planter, trellis.

  15. Dec 2022
    Issued Permit 202212168525 $$$ $900,000

    5-14/floors: renovation of guestrooms including n finishes, plumbing fixtures and lighting.

  16. Dec 2022
    Issued Permit 202212168537 $$$ $900,000

    15-24/floors: renovations of guestrooms including new finishes, plumbing fixtures and lighting.

  17. Apr 2023
    Issued Permit 202304115502 $$$ $159,000

    Add/relocate sprinkler heads to accommmodate new remodled areas in following spaces basement level bdc, 1st, 2nd & 3rd fl.

  18. May 2023
    Permit 202305026872 $$$ $1,000,000

    Basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of existing restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.

  19. Jun 2023
    Permit 202306069335 $$$ $20,000

    Basement: conversion of existing back of house space to new offices/changing rooms, new partitions, finishes & lighting.

  20. Jun 2023
    Permit 202306210467 $$$ $48,000

    Upgrade 13 guest rooms to hearing impaired standards & provide smoke detectors with audible bases & visual notification appliances in sleeping areas & bathrooms. there were no modification on the building mechanical sys that can affect the original design or operation of the existing smoke control systems.

  21. Jun 2023
    Permit 202306230780 $$$ $250,000

    New mechanical system for newground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872.

  22. Jun 2023
    Permit 202306260883 $$$ $50,000

    Structural shop drawings and calculations for new 3/f outdoor trellis. (design previously approved under permit 202212138174).

  23. Oct 2025
    Issued Permit 202510097064 $$$ $40,300

    Elevator modernization, modification. demolition existing elevator machine room (emr) heat detectors as shown on plan. demolition shunt trip control relay for shuttle elevator.

DBI holds 82 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 82. 6 of them are nominal $1 street-space or sidewalk permits. 3 expired permits are not shown. The assessor's roll gives 1989; this address is recorded as built 1988.

Nearby