683–691 Broadway
Chinatown · San Francisco, CA 94133
Permit history
-
Nov 1983
To be build anwing by the side of the store.
-
Dec 1984
Parapet bracing per attached plan.
-
Apr 1985
Repair the cracks of the brick wal.
-
Mar 1986
Construct an awning in front of my store at least 8' above.
-
Mar 1987
Install & build canvas awning.
-
Mar 1994
Reroofing.
-
Dec 1997
Seismic retrofit umb - special procedure.
-
Mar 2002
Reroofing.
-
Jun 2002
Install fire sprinkler system per ordinance 165-01 3rd, 2nd floors stair landing to 1st floor outside.
-
Nov 2002
Street space & sidewalk repair.
-
Jul 2004
Proposed remodeling existing restaurant, new replacement exhaust & roof fan unit. hood extinguisher.
-
Oct 2004
Install a new automatic fire suppresion system for the hoed & duct in the kitchen. using range guard.
-
May 2013
To comply with ordinance 029-13 installation of grab bars in sro at hte following locations, 2 tubs and 2 showers.
-
Jun 2015
Existing partial partition wall to be removed at ground floor.
-
Jul 2015
Remove all towerstream wifi antennas and associated equipment to comply with planning department complaint no 12199.
-
Jul 2017
Like for like voluntary fire system replacement with new control panel, smoke det, pull station. tie in e 4 bells to new panel. install monitor module to tie in ex waterflow device. comply with sffc sec 11037.6.1 by 2021.
-
Jan 2024
To comply with abe program ord 51-16 201910247358. install wireless door bell and associated signage.
-
Mar 2024
Install wireless door bell and associated signage to comply with the accessible business entrance program. abe #201910247362.
-
Mar 2024
Install wireless door bell and associated signage to comply with abe ord 2019107360.
-
Mar 2024
Install wireless door bell & accociated signage to comply with accessibility business entrance program ordinance 51-16. abe #201910247361.
-
Mar 2024
Upgrade existing fire alarm devices to be replaced to include manual pull stations and smoke detectors. (e0 bells to be replaced with horn/strobes & strobes.units to have 520hz low-freq audibles installed. facp shall be monitored with starlink 24v cell gms sole path comm.
-
Apr 2025
To legalize existing awning under awning amensty: there is a bedroom above the awning doesn't block fire escape sidewalk depth 8.9 ft, attachements 7 x 1/4" screws on top, 7 x 1/4" on bottom 3.25 ft x 3.3 ft x 20 ft.
-
Apr 2025
There is a fire escape above awning 18.34" from bedroom window to ground 14" 4' from edge of awning to curb awning depth= 4.2" (ying ye trading inc.).
-
May 2025
To comply with awning amnesty, legalize awning (jing ye co inc.).
DBI holds 33 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 33. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update