1300–1308 Stockton Street
Chinatown · San Francisco, CA 94133
-
1977
Yuet Lee Restaurant traces its business here to 1977; the city's survey lists it among North Beach's legacy bars, restaurants and businesses, a concentration it records as the highest in the city.
-
Jan 1982
Additions alterations or repairs.
-
Sep 1983
Additions alterations or repairs.
-
Oct 1983
Remodeling restaurant, new v.a.t. floor.
-
Mar 1987
Repair holes and painting - plaster holes in basment.
-
Oct 1994
New store front recess 3 ft from front.
-
May 1999
Install new canvass awning over store front.
-
May 1999
Remodel existing retail store including new store front.
-
Oct 2001
Reroofing.
-
Jun 2002
To install fire sprinkler system per ord 165-01 3rd/2nd floor & stair landing to 1st floor.
-
Feb 2009
Reroofing.
-
Apr 2012
Replace existing non-compliant single glazed aluminum windows with new fiberglass all ultrex single hung " integrity" marvin, dual glazed windows @ front sides of existing 3 stories building on broadway and stockton ave. sq ft. total numbe rof windows to be repalced: 38 windows.
-
May 2013
To comply with ordinance 029-13 installation of grab bars in sro at hte following locations, 5 bathr and 2 showers, 2 tubs.
-
Nov 2016
Replace damaged wood stocking and door with new one, in kind - 5' x 9' on front on g/f.
-
Jan 2017
Stucco repair exterior at the front less than 50sf.
-
Sep 2017
Seismic retrofitof soft story comply with sfbc 4d mandatory seismit retrofit iebc a4 2016 (residential).
-
Sep 2017
Seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (commercial).
-
May 2019
Like for like system replacement with new control panel, smoke detectors & pull station at the same location. tie-in existing bells to new panel. will comply with notification devices for the rest of building by 2021.
-
Aug 2020
Comply with his complaint 202043181: item 2. provide handrails at middle stairs; item 3. provide handrails at back stairs; item 4. provide guardrails at back stairs; item 5. provide galvanized metal or masonry lining, and self-closing, tight-fitting lined door only.
-
Jul 2021
Seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (commercial).
-
Jul 2021
Seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (residential).
-
Nov 2023
The project is the business entrance barrier remediation per compliance category two determination (abe 201910247386). request technical infeasibility to correct level change between sidewalk and entrance landing. request equivalent facilitation for non-compliant maneuvering space at entrance.
-
Mar 2024
Install wireless doorbell and associated signage to comply with the accessible business entrance program (abe). abe# 201910257399.
-
Mar 2024
Upgrade to existing fire alarm devices to be replaced to include manuel pull stations & smoke detectors. existing bells to be replaced with horn / strobes & strobes. units to have 520 hz low-frequency audibles installed. the fire alarm control panel shall be monitored with a starlink 24v cell gms-sole path.
-
Apr 2024
As built for permit application 2024-0318-8053. relocate devices on 2nd and 3rd levels. add idnac repeaters on 2nd & 3rd level.
DBI holds 37 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 37. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update