1301–1317 Stockton Street
Chinatown · San Francisco, CA 94133
-
1907
Built to the design of Harold D. Mitchell, whose North Beach work the city's survey documents.
-
1913
The 1913 Sanborn map shows club rooms on the upper floors of this building.
-
May 1992
Replace 2 wooden window with aluminum frame window.
-
Mar 1997
Reroofing.
-
Sep 1997
Reroofing.
-
Oct 2001
Barrier removal/bthrooms/coupon booth/teller counter, etc.
-
May 2003
Renovation of bank retail space & atm area.
-
Jun 2003
Install @ store front awning.
-
Oct 2003
Voluntary ada compliance front door only.
-
Mar 2004
Basement water damaged beams, columns and floor under sidewalk to be repaired.
-
Jul 2004
Relocate existing entrance door, enclose entry area.
-
Sep 2007
To renew 200403157880.
-
Nov 2007
Revision to app # 200403057880/ for new foundation at front of building due to unforseen field conditions.
-
Mar 2010
Copy change to existing awning (east west bank).
-
Jul 2011
Replace tile floor in shower room, repair rotten subfloor @ 2nd floor level.
-
Sep 2018
(residential) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.
-
Sep 2018
(commercial) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.
-
2019
The 2019 updated survey gives this building as an example of one that qualifies as a district contributor on the strength of its 1930s streamline alterations rather than its original form.
-
Jun 2019
Alteration to store front at street level of stockton st elevation.
-
Nov 2019
Portion of existing wood floor framing over electrical basement space to be removed & replaced w new light weight concrete fill over metal deck. hss steel members will be used to span over existing opening & bear directly on existing below grade brick walls. portion of existing wood floor framing to be removed/ replace.
-
Dec 2019
Ti for retail bank: new office, teller counter, bank vault, & new exterior bank entrance. minor facade modification.
-
Mar 2020
Replace existing footing with new concrete footing in the 1st fl and repair wood stair in the basement level.
-
Jun 2020
Install 2 illuminated wall signs for existing "east west bank".
-
Jul 2020
Additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258).
-
Aug 2020
At broadway sidewalk, repair and strengthening existing access to basement. replace glass block with new concrete. at stockton sidewalk remove access to basement and provide new structural slab at opening.
-
Nov 2020
Revision to permit application 201809140258 - relocate new steel columns and ada bathroom.
-
Apr 2021
Install one awning frame with material for existing "east west bank", no signage is proposed on awning.
-
May 2021
Replace existing fire sprinkler system with pendent sprinkler heads for the new ceiling. uprights refer to approved building plans # 2019-1220-0173.
DBI holds 43 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 43. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update