100–118 Columbus Avenue
Chinatown · San Francisco, CA 94133
Permit history
-
Aug 1992
Sign painted on awning 9212841.
-
Sep 1999
Reroofing.
-
Feb 2001
Umb retrofit.
-
Dec 2002
Street space.
-
Jan 2003
To install fire sprinkler system to comply with ordinance #170-02. comply nov 200236396.
-
Oct 2003
New store front, new second stair, minor partition, new lighting.
-
Mar 2006
Add partition walls, electrical, lighting, fans, plumbing, ada bath, floors, soffit, front fixed window. change of use from retail to skincare. all work on 1st floor.
-
Oct 2006
113 residential & 7 tourist units to be reduced to 99 residential units plus managers. remodel of existing sro building-new community kitchen, new common bathrms and showers. reframing at interior and lightwells. no change at exterior facades. only at lightwells.complaint #200339905 bid.
-
May 2009
To complete work and obtain final inspection for work approved under appl#200610135025.
-
Aug 2009
Revision to permit application 2006.10.19.5025 and 2009.05.04.7567 (renewal). new kitchenetes (2 total) at 2nd and 3rd floors. new common bathrooms and showers, finish, electrical, plumbing upgrades. new laundry room.
-
Jun 2012
Rev. permit application 200908255517: attic level-attic to remain non-habitable space, no storage. provide draft stops in the existing attic. provide header at removed walls at the 2nd & 3rd floor per enclosed details & locations on permit application 200908255517. provide venting per cbc 1203.2.
-
Jul 2012
Install fire sprinkler system to remodel sro hotel, bathroom to existing fire sprinkler system. reference 2001401224593 and 200412091034 orig fire sprinler permits.
-
Sep 2012
Revision to permit application 2009.0825.5517: relocate laundry from ground floor to basement, provide additional showers & toilets at 2nd/3rd floors, renovate penthouse, number of residential units remains the same. repair existing stairs from ground to basement.
-
Nov 2012
Replace lightwell double hung windows with same size and location. u factor 0.40 max. 55 windows not visible from street.
-
Feb 2013
Provide fire alarm system as per request under permit application 201207255702 (new sprinkler system), permit application 200610135025 (building remodel), permit application 200310080693 (fire sprinkler monitoring). new f/a panel, 26 notification devices, 3 smoke det., and 1 pull station.
-
Aug 2023
Upgrade e commercial entry per ord 51-16 abe program, comply with accessible business entrance program-abe 201812052794, install power door operator.
-
Dec 2023
Shoring for jackson square improvements. to perform alterations to the existing surface parking lot to accommodate a one-story building + basement and add'l site improvements.
-
Feb 2024
Erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits.
-
Jun 2024
Upgrade waterproofing system at existing below grade buliding wall/foundation along the property line adajacent to 124 columbus ave, 150 columbus, 530 jackson, 535 pacific, 545 pacific, 845 montgomery st.
-
Oct 2024
Revision to permit application 202402055285 & 202312273130, elimination of battery vault at utility garden area and addition of subterranean vault at pavillion basement level with associated changes to foundation and shoring.
-
Mar 2025
Install (1) 6" fire service supply into building. install (2) fire department connections, one at columbus ave gate and one at jackson st gate.design and install automatic wet fire sprinkler system throught building.
-
Mar 2025
Install 21 linear feet of 6" fire water ductile iron pipe cl53 before bfpv, 116 near feet of 6" cl53 after bfpv and 1 ea of 6" fire water backflow preventer (bfpv) wikins 35d astda with oslv valves. with underground.
-
Jul 2025
Add 1 new booster supply, add 2 new smoke detector, add 1 errc led annunciator. ref #202402055285.
-
Aug 2025
Reroofing with hot work.
-
Feb 2026
Revision to permit application: 202402055285. relocate proposed fire rated exit passageway from inside the existing vehicular tunnel to new location in 114 columbus av. infill existing opening located at grade to accommodate new higher grate at interior courtyard. three existing door to be raised.
DBI holds 67 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 67. 13 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update