602–606 Jackson Street
Hotel
-
1909
Built.
-
February 14, 1909
R. W. Moller contracted to put up a three-storey and basement brick building for the Northside Realty company, at $35,400.
-
June 16, 1912
Arthur Elvin contracted to put up a two-storey brick rooming house, at $5,497.
-
1919
The jazz composer Jelly Roll Morton played a residency at the Dixie Hotel Bar and Cafe here in early 1919.
-
1950s
Three Manilatown businesses traded from this corner in the late 1940s and 1950s — Mango's Smoke Shop, the Bagong Sikat Restaurant and the Manila Café — among the row of Filipino cafés, barber shops, pool halls and smoke shops that ran along Kearny Street from Pine to Pacific.
-
Feb 1983
Comply with parapet safety program.
-
Jan 1984
Remove existing walls & install new walls.
-
Oct 1995
Add new handicap washroom, new svc counter, replace tiles.
-
Feb 2001
Seismic upgrd wrk & associated disability work in accordance to sq ft unreinforced masonry ord bolt-plu.
-
Oct 2009
Repair fire damage, painting, cleanup, disposing of debris, repairing & replacing door, door jame, rapairing, replacing total of 7 windows & frames, r/r some flooring, reinforcing number of joist and studes. no structural and exterior work. no window at front. replace window in kind.
-
Dec 2010
Repair existing restuarant damaged by fire. replace new equipment, hood, and lighting. lower existing floor to provide accessable at front door. to comply with nov #200923187.
-
Feb 2011
Install auto door opener at front door & remodel existing restrooms. no structural work.
-
Feb 2011
Project under construction by app#201012086333 under this permit. rebuild the type 1 kitchen exhaust system and make up air system in existing restaurant kitchen area.
-
Mar 2011
Install ul 300 approved fire supression system for kitchen hood.
-
Jun 2011
Convert existing bar & night club in basement into a massage establishment & comply with nov# 200560305 for electrical work. bid #200923185 & #200923187, ces#200560305.
-
Jun 2014
Change 7 tubs to showers in massage establishment. comply with 201342611.
-
Jul 2017
Construct a.d.a toilet room, cashier counter, install two hand sink. one prep sink & replace three compartment sink @ existing restaurnat.
-
Mar 2021
Alteration of subsidewalk basement roof slab to install new accessible curb ramp.
-
Dec 2022
Reroofing.
-
Sep 2023
Install 2 new awning with yellow fabric cover in front of restaurant on kearny st. each awning is 174"x48"x48".
-
Mar 2024
Build shared spaces per plan.
-
Jun 2024
Upgrade fire alarm system to comply with 2022 sffc 1103.7.6.1, ab#3.08 & 2.01, and 2022 cfbc, cbc and nfpa 72-022. system will be automatic and manual system with pull stations at req exists since building has partial f/s sys.facp shall be moniitor with a new cellular sole path communiation.
DBI holds 56 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 56. 7 of them are nominal $1 street-space or sidewalk permits. 7 expired or cancelled permits are not shown. The contract of 1912 is to put up the building; the assessor's roll gives 1909.
Nearby
- 533–535 Jackson Street Same street
- 603–609 Jackson Street Same street
- 614 Jackson Street Same block
- 604–620 Jackson Street Same block
- 626–636 Jackson Street Same block
- 640–648 Jackson Street Same block
- 900 Kearny Street Around the corner
- 848–868 Kearny Street Around the corner