814–822 Montgomery Street
Chinatown · San Francisco, CA 94133
Permit history
-
Mar 1985
2 new windows 5 new awnings.
-
Jun 1989
Re - roofing.
-
May 1991
Tenant improvement including interconnecting stair, 1, 2 lvl.
-
Apr 1992
Tenant improvements including removal of non-bearing partiti.
-
Feb 1999
One-stop, isntall new doors, build new walls, ada bath, entrance.
-
May 1999
Fire sprinkler modifications four heads total.
-
Jul 2004
Reroofing.
-
Jun 2010
Interior demolition of non bearing walls only on 1st, 2nd and 3rd floors. ti under separate permit.
-
Jun 2010
Install new elevator in existing building. new elevator will remove accessibility issue between floors. work also includes replacement of some windows, doors in atrium, minor alterations @third floor & new skylight @ top of elevator shaft. sprinkler work and tenant improvement by separate permit.
-
Jun 2010
New non bearing partition wall on 3rd level, relocation of e door on 2nd level, new rated infill wall and new non rated furred out walls on 1st level.
-
Jul 2010
Selective domolition for exploratory purposes on all 3 floors, plus basement. no structural walls removed. 100 sq ft. of total wall opening per floor. all work within tenant space only and will be on-bearing walls only.
-
Aug 2010
Install 2 fire sprinkler heads top/bottom. elevator shaft.
-
Sep 2010
Fire alarm for elevator recall. demolition existing sprinkler monitor and connect to new panel.
-
Mar 2012
Non load bearing partition walls door/windows, new electrical outlets & fixtures. new hvac system. small kitchen remodel.
-
Mar 2012
Relocate 5 existing heads and add 3 new sprinker heads in basement only, includes 2 flexheads.
-
Mar 2012
Basement - new lighting title-24, ref permit application 2012.03.12.5863.
-
Apr 2012
No work done, change type of construction & stories per building inspector request. type iii-b, 3 stories over basement. ref. to permit application 201203125863 & 201203216545.
-
Sep 2015
Selective demolition - all 3 floors: no structural walls removed, all work within tenant space. non bearing walls only. remain vacancy under ab-017. maher na.
-
Dec 2015
New ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinance.
-
Dec 2015
Revision to 201512084446. reconfigure 1st fl mens restroom instead of women restroom. remove existing unpermitted signage. add new skylight. n/a for maher ordinance 155-13.
-
Jan 2016
Replace (2) heat pumps on 2nd floor and reduct as necessary. reduct (3) existing package units to accomodate new floor plans. maher na.
-
Mar 2016
Replacing flex with emt for the existing 2nd floor fire alarm devices. ref pa 2015-1208-4446.
-
Apr 2016
All 3 fl: extend fire sprinkler head for new ada restroom @ remodel area. ref #2015-1204-4446. n/a maher ordinance.
-
Feb 2022
Minor alteration for commercial offices. ground floor work only. mep scopes are design-build and under separate permit. no change of use of floor area proposed.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update