100–130 Stockton Street
Chinatown · San Francisco, CA 94108
-
1974
Built.
-
Nov 1981
Additions alterations or repairs.
-
Sep 1993
Drywall construction; walls & ceiling t-bar ceiling.
-
Jul 1994
Tenants improvements kitchen serving and seating area.
-
Dec 1995
Rmdl existingretail floors 1, 2&3, minor partition, sprinkler/fire al.
-
May 2011
5th floor tenant improvement for retail sales area. life safety permits separate.
-
Aug 2011
4th floor t.i. interior non-structural work of existing building, new partitions & lighting.
-
Nov 2011
Interior tenant improvement on the 1st and 6th floors. no exterior work this permit.
-
May 2014
Revision to permit application 2014-0304-9793 - change address from 170 ofarrell to 120 stockton space 428: t.i project for a michael kors vender shop inside macy's store. work to include electrical., flooring, drywall, and structural signage reinforcement. n/a for the maher ordinance #155-13.
-
May 2018
Major alterations of an existing building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply with maher**.
-
Aug 2018
Proposed soft demolition consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215.
-
Aug 2020
Revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade.
-
Dec 2021
Construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215.
-
Feb 2022
Interior tenant suite 856 fit out & change of occupancy fornew restaurant.t.i. improvement within an existing 8 stories shell building, scope to include: interior partitions, kitchen equipment, retrooms, mechanical, electrical & plu system improvements as required for a full t.i. build out.no site work in this scope.
-
Jul 2022
Placement of concrete & ramps only for a future tenant improvement. new concrete slabs to be placed above existing concrete installed under bpa#202008101490 in preperation of future t.i. no demolition of existing concrete. temp guard will provided btw future t.i. along ramps, and where change in elev exceeded 6".
-
Aug 2022
G/f: tenant improvement. construction of new non-structural partitions, new acoustical ceilings (restroom only) and new wall finishes (restroom, janitor's closet, drinking fountains surround only).
-
Nov 2022
Tenant improvement in a vacant core & shell building. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework.
-
Nov 2022
4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code.".
-
Dec 2022
Lobby/6/7/8-f: t.i., demolition of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deck.
-
May 2023
Deferred mep 1st, 4th, 5th fl. ref 202211096227.
-
May 2023
Mep deferred permit application 202211237089. 4th & 5th fl exhaust fans.
-
May 2023
5/f kitchen: deferred mep permit application 2022-1221-8887, floors 4 & 5.
-
Apr 2026
Core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant.
-
Jul 2026
1/f: interior t.i to expand an existing m group - ground floor tenant space into portion of the adjacent space, resulting in a single combined tenant space of approx 5582 sq ft. the adjacent space is under the same brand/ownership and filed in a seperate permit app. work includes nonloading partitions.
-
Jul 2026
1st floor ti: renovation of an existing white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new furniture, and fixtures, new mpe work and fixtures.
-
Jul 2026
1st and 3rd floor - tenant improvement at ground and 3rd floors including demolition and construction of interior partitions and doors, electrical, hvac and plumbing.
DBI holds 192 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 192. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 46–48 Stockton Street Same street
- 150 Stockton Street Same street
- 39–41 Grant Avenue Same block
- 45 Grant Avenue Same block
- 51–55 Grant Avenue Same block
- 101–109 Geary Street Same block
- 235–239 Geary Street Around the corner
- 111 Ofarrell Street Around the corner