Permit history
-
Dec 1984
Interior demolition, no structural work.
-
Jan 1985
Handicap restrm, 3 new stairs, new storefront & seismic work.
-
Aug 1985
Install steel reinforcement of existing wood column.
-
Sep 1985
Rigid frame gunite & plywood.
-
Oct 1985
Install sprinkler system.
-
Nov 1985
Placement of two steel pipe & glass awnings.
-
Jul 1993
New carpets & millwork new pot lights.
-
Mar 1995
Structural renovation.
-
Jul 2004
Demolition existing grease exhaust fan & duct work/install new grease exhaust fan & ductwork.
-
Jul 2004
Remove leaking skylight @ ex roof -install new roof joist and roofing @ mezzanine.
-
Jul 2004
Replace existing dry chemical kitchen hood fire suppression system with new wet chemical fire suppressi.
-
Jun 2005
Demolition existing non-bearing partition to permit installation of new elevator equipment & re-construct new.
-
Nov 2005
Install elevator machine rm ventilation.
-
Jul 2013
Reroofing; remove exisitng finishes, installation of modified bitumen system: class "a".
-
Mar 2018
New locker rooms & storage in the basement.
-
May 2018
Front facade changes (historic)storefront improvement for existing retail store @ ground floor.
-
May 2018
Ti - ground floor and basement non load bearing walls, finishes, display cases, lighting, mep under sep permit. sprinkler system existing to reamin - no sprinklers on ground floor.
-
May 2018
Fire sprinkler ti relocated sprinklers - 6; added sprinklers - 1. ref pa 2018-0302-2723.
-
Jul 2018
Interior "soft demolition" existing retail. ground floor/basement/mezz. all exterior work "storefront and sinage" under seperate permit. stairs /walls and doors under separate permit 201805078329.
-
Jul 2018
Install new vrf condensing unit including piping. shell & core work only. tenant improvement under separate permit.
-
Aug 2018
Interior ti existing retail, gr floor basement, new partitions, new flooring/ wall / ceiling finishes, new product display fixture, new ceiling with light fixture, new duct work from new mechanical unit, new electrical, new plumbing, new structural work storefront & signage under separate permit.
-
Oct 2018
To erect a electric single-faced sign.
-
Dec 2018
New exterior awnings for existing retail use.
-
Dec 2018
Painted sign on awning for existing retail store.