278–290 Post Street
Financial District · San Francisco, CA 94108
-
1910
Built.
-
July 5, 1964
Photographed.
-
Jun 1983
Additions alterations or repairs.
-
Nov 1989
Alteration to existing offices at 5/f alteration existing toilets 5/f.
-
Sep 1994
Seismic strctl strengthen, renovation of exiting elevator.
-
Jun 1995
T.i. new hvac, electrical, partitions, sprink, life safe sys, elev.
-
Jun 1995
Interior work tenant improvement 1st & 2nd floors.
-
Jun 1995
Exterior facade work at 1st floor.
-
Jun 1995
Tenant improvement for retail use inc stock/office areas.
-
Jan 1996
Revise to app #9509342.
-
Apr 2000
Remove/replace storefront/remove/replace awning, etc.
-
Sep 2000
Iterior tenant improvement-removal & add light fixtures. minor interior partition finishes.
-
Jun 2003
Restoration of existing 7th floor decorative railing, other railing repairs, replacement of existing deck coatin.
-
Dec 2004
Tenant improment on the 1st level of an existing 6 story building. work includes new exterior, entry doors.
-
Aug 2005
Tenant improvement on basement level, new bathrooms, kitchen and remodel of entire space.
-
Jan 2013
Interior remodel of existing niketown store. work to include new walls, finishes, fixtures and mep. relocate and install new escalators.
-
Jan 2013
Exterior store front remodel of existing niketown store.
-
Apr 2013
Demolition of existing store fixtures, finishes, lighting and limited mechanical, electrical systems. removal of all shoe tubes and dumb waiters all work to comply with ab-017.
-
Aug 2013
Revision to permit application 201301228486 reflects field conditions and as builts on floors 3 through 7 with mep. sprinklers and storage racks on seperate permit.
-
Mar 2015
Remodel existing nightclub - bar/lounge, new banquettes & tables, new finsihes at walls, floors & ceilings. remodel bar & restroom. existing mechanical, electrical, & plumbing systems to remain. sprinklers, fire alarm, under separate permits. n/a maher ordinance.
-
Oct 2017
B/1/2 levels: interior tenant improvement with new furring walls installation & paint finishes throughout, basement/ground & 2nd level.
-
Jan 2018
Replace existing a/c unit at roof.
-
Mar 2019
6th fl - interior remodel - new finishes, new fixtures, limited new lighting. maher na.
-
Mar 2019
Level 1 & 3 interior remodel, new finishes, new fixtures limited, new lighting - no exterior work.
-
Mar 2019
Level 4 interior remodel, new finishes new fixtures, limited new lighting -no exterior work.
-
Mar 2019
Level 5: interior remodel new finishes, new fixtures, limited new lighting - no exterior work.
-
Mar 2024
Replacement of existing fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generator.
DBI holds 111 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 111. 12 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 275–299 Post Street Same street
- 350–360 Post Street Same street
- 246–250 Post Street Same block
- 228–240 Post Street Same block
- 355–369 Sutter Street Same block
- 371–375 Sutter Street Same block
- 345 Stockton Street Around the corner
- 140 Maiden Lane Around the corner