228–240 Post Street
Financial District · San Francisco, CA 94108
Permit history
-
Dec 1990
Demolition non-sturctural int partitions incl suspended ceilings.
-
Dec 1990
Seismic upgrade, sprinklers, hvac, electrical & phone system.
-
Jun 1991
Tenant improvement.
-
Sep 1991
Tenant improvement.
-
Dec 1992
Constr new retail space with new partition, lighting, plumb, etc.
-
May 1995
Architectural and full title 24 upgrade under separate permi.
-
Jun 1995
Renovate inretior store-demolition under #9504257.
-
Jun 1995
For mechanical, electrical, hvac, & sprinklers.
-
Mar 2000
New stair from basement to ground floor upgrade restroom, new storefront.
-
Mar 2002
Renovation of existing stor retail/dim non bearing partition/install new h.c. bathroom/install new prt wal.
-
May 2002
Street space permit.
-
Jun 2009
New paint finishes, patch fl.to match existing.partition walls, as-built currently demolition.remove fixt, cabinets, install new. mirror, surface-mtd. standards. ft rm, doors & hardware.new power & data for cahs registers, phones, sign system at entry.storefront signage under sep/permi.
-
Jan 2012
Install new interior stairs & new escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit.
-
Jan 2012
Interior selective demolition only to include removal of partitions, partial floor areas & related structure & all finishes down to rated partition or structure. existing vacant shell & exterior to remain as is (no change).
-
Jul 2012
Facade alteration on ground floor only. signage under separate permit.
-
Jul 2012
Interior t.i for retail store on all levels-work includes new partitions, fixtures, new bathrooms, new m.e.p. interior work only. storefront under seperate permit-permit application 2012-0706-4262. signage & fire protection under seperate permits.
-
Jul 2012
Fire sprinklers tenant improvement core on existing - underground and riser. entire building. relocating dry standpipe.
-
Oct 2012
Add & relocate fire sprinkler heads per t.i. 3rd floor. 4 add, 83 relocate. basement: 3 add, 38 relocate. 1st fl: 8 add, 28 relocate, mezz: 3 add, 43 relocate, 2nd fl: 14 add, 75 relocate.
-
Feb 2013
M.e.p work only for tenant improvement permit application 2012-0726-5879. revisions to approved m.e.p only.
-
May 2013
T.i. for retail store on ground floor, basement & 2nd floor. no exterior work, mep & fire protection under separate permit. demolition permit #2013.0423.5237 must be issued prior to this permit.
-
Jun 2013
M.e.p. permit associated with ti under permit application 2013-0510-6665-for a new retail store in the basement, 1st & 2nd floors. fire protection under seperate permit.
-
Jun 2013
2'vert limestone(infinito stone)clad 2 sides facade adjacent to neutral columns of base building(display frames).2'wide stone horizontal signage band span entire storefrt at 2nd level(limestone)with a pin mounted illuminated logo.storefrt displayuse glazing aka starphire glass polished stainless steel.
-
Nov 2013
Fire alarm system upgrade due to tenant improvement.
-
Feb 2021
Remove existing millwork damaged and replace in-kind.construction will be required. work to be in 2 phases as follows. 2/f shall be first to begin, then followed by 1/f. maher n/a.
-
Feb 2026
Demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.
DBI holds 104 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 104. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update