246–250 Post Street
Financial District · San Francisco, CA 94108
Permit history
-
Feb 1984
Remodel 1st floor sterngthen, add posts and footings.
-
Jan 1985
Tenant improvement to replace existing gyp bd. handrail.
-
Jun 1986
Petitions - removal & replacement; lighting.
-
Aug 1989
Demolition & replacement of structural slab & sidewalk.
-
Jun 1990
Tenant improvement of 900 sq ft. single room interior 1/f.
-
Apr 1991
Modifications of existing openings bet. 250 post & 240 post.
-
Sep 1991
Sprinkler work.
-
Apr 1993
Revision appl #9106686 and 9114569.
-
Jul 1993
Close commun openings bet 228/246 post st-floors 1, 2, 3 only.
-
May 1994
Soft & hard demol interior of building remove archit. finish.
-
May 1994
Seismic upgrade.
-
Jul 1994
Tenantimprovement install fire sprinklers.
-
Oct 1994
Add roof enclosure and clerkstory windows above escalators.
-
Nov 1994
Tenant improvement and minor exterior modification.
-
Dec 1994
Interior t.i..ref permit application 9408313/r1-seismic work, ada reqmts.
-
Dec 2004
On all floors & basement non-structural demolition to expose base bldgf condition prior to apply for.
-
Feb 2005
Interior t.i. new mechanical, lighting systems, new partitions. minor structural floor infil on fl 1.
-
May 2005
Basement 1st & 2nd floor.s (add and relocated fire sprinkler heads per t.i).
-
Dec 2006
Non structural demolition of vacant retail space, removal of post st. entry doors. construction of temporary post st. sidewalk barricade. per ab-017 (interior demolition only).
-
Jan 2007
Complete interior renovation inc., equip., finishes. work includes new hvac, electrical, plumbing. basement, ground, mezz. exterior storefront will include new entry. demolition & barricade appl#200612139735.
-
Sep 2012
Basement level-construction of new workshop in existing space. new finishes & fixtures. new hvac, electrical & plumbing. *steamer hood - sprinkler on seperate permit.
-
Feb 2013
Remodel of main sale area. new counters and cabinets and finishes, lighting minor mechanical work.
-
Oct 2019
Like for like replacement of (1) box car a/c unit & fluid cooler n/a maher.
-
Feb 2026
Reroofing: work at front uppder ledge roof and front canopy roof, remove 431 sq ft of existing roofing and dispose of property, install 431 sq ft of 1/4 inch fire rated board over the existing plywood, install 431 sq ft of 60 mil gaf pvc single ply material, no asphalt or torch down.
DBI holds 82 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 82. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update