37.7889, −122.4070 A locator map appears here once a Mapbox token is configured.

345 Stockton Street

Chinatown · San Francisco, CA 94108

  • Built 1972
  • Hotel
  • 35 stories
  • Zoned C3R
  • District 3
  • Historic status: historic resource
37.7889, −122.4070 Street View appears here once a Google Maps embed key is configured.
610,645 sq ftBuilding area
668Rooms

Permit history

  1. Aug 1982

    Additions alterations or repairs.

    Cancelled Permit 8207014 $$$ $1,200
  2. Apr 1989

    Fire sprinkler alterations.

    Complete Permit 8906889 $$$ $399,000
  3. May 1989

    Fire alarm system and voice evacuation installation.

    Complete Permit 8908708 $$$ $488,000
  4. Oct 1997

    Alteration to restaurant space interior work, struct, electrical, me.

    Expired Permit 9720648 $$$ $1,000,000
  5. Mar 1998

    One-stop: alter extng 3 levels, retail space/new store front.

    Complete Permit 9804993S $$$ $6,000,000
  6. Nov 1998

    H.c. barrier removal, alterations to existing toilets.

    Expired Permit 9823491 $$$ $200,000
  7. Mar 2002

    Remodel the existing retail store on floors 1, 2, and 3.

    Complete Permit 200203141424 $$$ $750,000
  8. Mar 2005

    Exact replacement of cooling tower on roof top of grand hyatt san francisco, general & mechanical con.

    Complete Permit 200503167612 $$$ $497,000
  9. Sep 2006

    Replace two domestic hot water toilets with 6 (six) high efficiency low no boilers, remove/replace 2 heating hot water pumps. remove/replace 2 (two) domestic water pumps. capacity and size of equipment being replaced is equal to existing. using existing piping.

    Issued Permit 200609081764 $$$ $696,830
  10. Sep 2006

    Reroofing.

    Complete Permit 200609293784 $$$ $300,000
  11. Dec 2006

    Replace the existing fire alarm system.

    Plancheck Permit 200612220415 $$$ $1,000,000
  12. Dec 2007

    Guestrooms renovations (floors 3-34) installing new finishes, new electrical outlets. new lighting to replace existing. bathroom renovation & install new finishes throughout guestroom corridors. (see attached plans for details & full description of work.

    Complete Permit 200712211194 $$$ $1,200,000
  13. Feb 2010

    Fire alarm system upgrade.

    Issued Permit 201002166610 $$$ $425,000
  14. Dec 2010

    Ground floor tenant improvement: temporaty removal & re-installation of existing storefront & guardrail for new escalator installation. basement tenant improvement; reconfiguration of meeting rooms & upgrade and renovation including millwork, restroom finishes, plumbing fixtures & lighting, etc.

    Complete Permit 201012287485 $$$ $3,610,000
  15. Dec 2010

    Guestrms&bathrms: work to include but not limited to: installation of newfinishes; widen interconnecting doors btw guestrooms, remove tub and replace bathroom finishes with newtubs/shower stalls and newfinishes.newsliding doors &valences to be installed.replace existingwall coverings with newin area of.

    Complete Permit 201012287483 $$$ $2,980,000
  16. Aug 2011

    Ground floor tenant improvement: removal and replacement of selective store fronts.exterior improvements including landscaping and canopy replacement.

    Complete Permit 201108222979 $$$ $25,000
  17. Sep 2011

    1st. floor. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mechanical. & electrical. upgrades & improvements, mezz. t.i.: reconfig. floor. to create restaurant bar & small kitchen, new unisex bathroom mechanical., lighting, electrical. upgrades. 2nd. floor. t.i.: meeting rms. upgrades to lobby.

    Complete Permit 201109084161 $$$ $850,000
  18. Apr 2012

    34th floor: guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace existing bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil units.

    Complete Permit 201204027359 $$$ $850,000
  19. Aug 2012

    36th floor tenant improvemnets to meeting spaces, corridors and restroom. relocation of men's restroom. removal of restaurant and bar.to be converted to meeting and pre-function space. upgrades include funitures, mill work, new plumbing fixtures, lighting upgrades, mechanical&electric improvements.

    Complete Permit 201208278321 $$$ $1,500,000
  20. Dec 2013

    Alteration to an existing shell building work includes: seismic upgrade of impacted elements new structural frame, interior structural elements. new facade work including new structural glazing.

    Complete Permit 201312164258 $$$ $18,500,000
  21. Jun 2014

    Seismic strengthening of bar building structure. work includes new shear walls & moment frames, gravity elements at selected locations for new staircase & elevator.

    Complete Permit 201406027261 $$$ $179,000
  22. Sep 2015

    Basement: replacement emergency generator in existing generator room (electrical under separate submission permit).

    Issued Permit 201509177292 $$$ $375,000
  23. Jan 2016

    Design build metal pan stairs for existing and new retail spaces stair #'s 3, 4, 5, 6, & 7 on plans.

    Complete Permit 201601086714 $$$ $20,000
  24. Feb 2016

    Installation of new 50 kw photo voltic array in association with new apple retail store under app#201312164258.

    Complete Permit 201602058981 $$$ $600,000
  25. May 2018

    Interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes new partitions, new bathrooms, new lighting, new finishes & furnishing. mechanical & plumbing under sep. permit application.

    Complete Permit 201805108845 $$$ $500,000

DBI holds 222 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 222. 26 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update