391–395 Sutter Street
Office building · Financial District
-
1908
Built.
-
November 11, 1981
China Airlines (CAL) had its San Francisco headquarters here.
-
Jan 1989
Install partition counters closets tile carpet painting.
-
Jun 1989
Reroofing.
-
Aug 1993
Cosmetics to retail store 4th floor.
-
May 1995
Construct handicapped ramp for access to front door.
-
Oct 1996
Erect an electric sign.
-
Nov 1999
Interior tenant improvement no change to existing storefront.
-
Sep 2003
Tenant improvement interior remodel/reduce size of existing mezzanine/install nw ltg/some nw outlets.
-
Oct 2003
Addition to approved#200309255700. replacement of existing non historic storefront, addtion of hvac uni.
-
Aug 2006
Renew appl#200504140059.
-
Oct 2010
One unit: install 3 sinks in unit. remove partition walls. paint unit interior. adding 2 partition walls.replace interior door.
-
Apr 2011
4th floor-t.i., 2470 sq ft of office. m.e.p & fire alarm safety under seperate permit.
-
May 2011
Demolition of existing & installation of new cabs., counter & plumbing fixt., in bar & cafe are-installation of new non-load bearing wall & clo., door-demolition of existing clg., elements & installation of new susp. gyp. board soffits replace o/ bar area-floor. & wall finishes-relocation of existing lighting with low voltage.
-
Mar 2012
Lobby - replace the existing non-functional edwards 6500 fire alarm panel with an edwards est 3. all field devices are 100% compatible & will remain. 100% test of system is required. provide as built plans to fire inspector at time of inspection with riser + sequence + equipment list.
-
Jun 2012
Investigative demolition of existing stucco facade treatment in selective areas " starbucks".
-
Sep 2012
Demolition and replace existing stucco of facade, storefront glazing, store front system at entry and storefront glazed panels.
-
Dec 2016
Basement - fire sprinklers: voluntary upgrade of the existing fire sprinkler system.
-
Apr 2022
8th floor ste ti existing occupancy to be maintained 8 story office building new non structural walls, ceilings, lighting, plumbing fixtures and new finishes. new ada single stall bath at l8.
-
Feb 2024
Alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk.
-
Feb 2025
Install 1 facp; install 1 remote annunciator; install 9 smoke detectors; install 21 pull stations; install 2 monitor modules; install 1 dual monitor module; install 1 control relay; install 1 document box.
DBI holds 41 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 41. 1 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 371–375 Sutter Street Same street
- 400–414 Sutter Street Same street
- 355–369 Sutter Street Same block
- 345–353 Sutter Street Same block
- 246–250 Post Street Same block
- 272 Post Street Same block
- Grand Hyatt Union Square Around the corner
- 417 Stockton Street Around the corner