220–222 Post Street
Store building · Financial District
-
1907
Built.
-
1907
Designed by Herman Barth.
-
March 19, 1907
California Artistic Metal and Wire Company contracted for structural iron, steel and ornamental iron work on a five-storey and basement building, at $11,493.
-
Aug 1984
Demolition of storage in basement as shown on plans.
-
Aug 1984
Additions alterations or repairs.
-
Apr 1986
Extension of one existing elevator to basement level.
-
Jul 1986
Remove 2nd floor non bearing wall at stock room.
-
Jun 1996
Foundation, seismic upgrading, architectural, mechanical etc.
-
Jun 1996
Removal of interior non bearing partition.
-
Jan 1997
Install fire spinkler system incl n. bfp, fire pump, standpipe.
-
Feb 1997
T/i for basement first thru fifth floors.
-
Mar 1997
Install a cafe at 5/f per plan.
-
May 1997
Fire sprinkler system installation for entire floor.
-
Jun 1997
Partial 4/f tenant improvement.
-
Feb 2000
Remodel of men's dept on 5/f relocate sprinklers new lighting.
-
Jul 2006
Interkr non structural remodel of partial 4th flkiir arnabm vebdir area nedm sorubjkers ^ kufe safety under seperat permit.
-
Aug 2006
Rev. to approved permit application 2006/07/07/7599, revised partial 4th floor layout.
-
Jan 2017
Soft demolition ab-017. demoltion or removal of existing flooring, existing casework existing interior partition walls, existing ceiling lights and soffits, and existing cladding to structural. exit enclosure must remain.
-
Jun 2018
Core & shell, install new enclosed exit staircases, (elevator system design & specifications to follow). staircases to be design build & store front systems to be design build. no exterior work under this permit no change of use-retail use to remain.
-
Aug 2018
Soft story demolition non-structural, basement, 3rd, 4th, & 5th fl. per ab-17. ti under sep permit.
-
Mar 2019
Replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.
-
Oct 2019
Fire sprinkler changes to return to warm shell, remove and add.
-
Sep 2020
Interior partitions and finishes for white box. store fron to remain same. new drinking fountain.
-
Dec 2020
Install 3 new fan coils and ducting for the 1st floor only.
-
October 16, 2026
Louis Vuitton's Parent Company Snaps Up Union Square Building for $48 Million — Hoodline
DBI holds 60 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 60. 4 of them are nominal $1 street-space or sidewalk permits. 4 cancelled permits are not shown.
Nearby
- Head Building Same street
- 225 Post Street Same street
- 228–240 Post Street Same block
- Shreve Building Same block
- 231–233 Grant Avenue Same block
- 239 Grant Avenue Same block
- Phoenix Building Around the corner
- 134 Maiden Lane Around the corner