231–233 Grant Avenue
Financial District · San Francisco, CA 94108
Permit history
-
Mar 1983
Sign - erect.
-
Jul 1985
Minor cosmetic demolition. construction of open & private.
-
Dec 1989
Install fire pump and connect to existing hose reel line.
-
Nov 1990
Remodel 5/f for beauty parlor, install new walls, new wiring.
-
Jul 1991
Install new ceiling with lights new toilet rooms new carpet.
-
Oct 1991
Install new handicap bathroom, new lights & carpet.
-
Feb 1993
Permit inspection renewal #9118888.
-
Apr 1994
Tenant finishes for a beauty salon/retail facility.
-
Jan 2000
Seismic upgrade, handicapp accessibility, etc.
-
Dec 2000
Seismic upgrade done under permit 9913145, replace existingwood stairs with non combustible accssble stairway.
-
Sep 2001
Field ammendment to replace sidewalk orig permit # 901116 app# 9913145.
-
Dec 2001
New fire sprinklers system intallation.
-
Jan 2002
Tenant improvements, work is on the 4th, 5th, 6th floors, convert 4th & 5th floors from offices to spa.
-
Feb 2002
Fire alarm installation.
-
Oct 2002
Tenant improvement for art gallery consisting of display rooms, offices, accessible toilet rooms on.
-
Dec 2002
Revision to permit application 9913145 & #200012057207.
-
Jan 2003
Mechanical & electrical work for interior t.i. ref. to appl#200210159000.
-
Mar 2003
Sidewalk replacement on campton street.
-
Nov 2003
Removal of existingstorefront/stem wall, install new storefront with slider.finish to match existing.
-
Jan 2010
Interior tenant improvement with some demolition of existing non-structural walls & also existing convinience stair modification, nnew finishes, millwork, lighting & hvac system at ground floor level only. existing basement, 3rd. 4th. 5th. & 6th. floors to remain as is.
-
Feb 2018
Remodeling to remove and install new sink. install in 5 rooms cable light per plan and on hallway. replace existing light into led per plan.
-
May 2019
4th & 5th floor soft demolition. remove interior walls, t-bar, sheetrock ceilings, floor covering.
-
May 2021
4th fl - ti incluldes new non-structural partitions and finishes. all new or revised. hvac, electrical, plumbing and life safety work will be design build and submitted for permit separately if needed.
-
Dec 2021
Title 24 lightening and power for 4th floor spec suite to add new fixtures, circuiting and controls, new power and teledata for office workstations breakroom. ref pa202105240897 ti.
-
Dec 2021
Relocate fire sprinkler heads to accommodate new build out. ref to t.i. 202105240897.
DBI holds 48 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 48. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update