170–190 Post Street
Financial District · San Francisco, CA 94108
-
1908
Built.
-
1908
The Hastings Building was built to the design of Frederick H. Meyer, one of the works the Chinatown YMCA report lists for him.
-
Jul 1990
Cti one.
-
May 1991
Tenant improvement, build out part of the 1st & 2nd floor.
-
Jan 1992
Tenant improvements for retail shop-awning, partitions, floo.
-
Aug 1992
Cti ii.
-
Sep 1993
Extend phase z no face retail str-orig phase 1-r/r sisewalks.
-
Nov 1999
One-stop, tenant improvement of existing retail store.
-
Nov 2001
Interior t.i. to expand existing coach stor. work includes new partitions, flooring, finishes, casework.
-
Feb 2007
Remodel existing retail spaces on 1st floor, mezzanine and 2nd floor to include new display, lighting, electrical, counter and finishes. no change to existing mechanical system.
-
Mar 2007
Interior tenant improvement of existing retail space. finish work only. (no m.e.p. changes).
-
Nov 2012
3rd floor: t.i. include the demolition of non structural partitions and building new non structural partitions. all new or revised hvac electrical plumbing and life safety work will be design build and submitted separately(building not fully sprinklered).
-
Apr 2015
Interior drywall parition work, millwork, paint finishes. no exterior work, mep, fire sprinklers, life safety, structural, signage.
-
Oct 2015
Reroofing.
-
Nov 2015
Facade work on existing coach store, work includes structural & lighting.
-
Dec 2015
Limited reconfiguration of inerior partitions, millwork. exterior work under separate app. ground floor retail.
-
Jun 2017
4th fl suite 400: demolition non structural partitions and build new non structural partitions. all new or revised. mep, life safety, sprinklers under sep permit. no other interior work and no exterior work.
-
Mar 2021
Replace 1 cooling tower. replace 3 pumps (2 on condenser water loop & 1 on hhw). add 1 heat exchanger.
-
Dec 2021
Voluntary seismic strengthening to add two moment frames.
-
Jan 2022
4/f t.i includes the demolition of non structural partitions and building new non stru partitions. all new or revised mep and life safety/sprinler will be submitted separately.
-
May 2022
Title 24 drawings to be added to permit application 202201125838.
-
Oct 2023
Basement, 1st & 2nd - shell emising includes demolition of non-structural partitions and building non structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separately (building is fully sprinklered). structural work elevator pit.
-
Apr 2024
Basement-2nd floor- ti retail- interior basement elev. pit ground and second floor slab holes, shaft wall machine room, structural reinforcement and support for future 3 stop elevator.
-
Jun 2024
Interior floor leveling for basement and first floor infill and reinforcement of the existing slab at ground floor. additional colums and doundations underneath the midspan of 6 girders at basement. ref 202404301110.
-
Jul 2024
Interior tenant improvement new floor finishes, ceilings, non-bearing partitions, millwork finishes. mep and envelope shall be deferred to separate permits.
-
Sep 2024
Deferred mep to bpa#202407257271.
-
Nov 2024
From sidewalk height to bottom of building's 2nd floor windows from the corner of post st. and grant ave. 3 bays at ground floor, 4 bays at 2nd floor along grant av. 3 bay at ground floor, 2 bays at 2nd floor along post st. installation of new storefront btw vertical plasters with new finishes, glazing, entry doors.
DBI holds 132 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 132. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 150 Post Street Same street
- 185 Post Street Same street
- 220–288 Grant Avenue Same block
- 126–130 Post Street Same block
- 255–271 Sutter Street Same block
- 101 Kearny Street Same block
- 164–166 Grant Avenue Around the corner
- 231–233 Grant Avenue Around the corner