175–177 Post Street
Office building
-
1908
Built.
-
October 16, 1908
Dyer Bros., Golden West iron works and P. J. Walker contracted for steel work, fire escapes and brick work on a nine-storey building for H. Liebes & Co., at $40,790.
-
Dec 1981
Otc alterations permit.
-
Jan 1984
Tenant improvement.
-
Jun 1984
Demountable partition of 3rd fl.& drywall partition const.
-
Jul 1985
Retail story alterations.
-
Feb 1987
Modifications of existing non-bearing walls & construction.
-
Sep 1987
Partitions, install plumb fixtures, new floor covering/cabinet.
-
Jun 1988
Ground floor retail ti, new partitions, ceilings, flooring.
-
Jun 1989
Reroofing.
-
Jul 1992
Interior partition wall demolition, construction.
-
Oct 1997
Demolition new structural partitions/new ceiling height prtn.
-
Jun 2000
@ 1st fl: new entry way move back to make landing level.
-
Apr 2004
Interio4 upgrade f exisitin retail space, increase in floor arear no plumbing llightiing/electrical under.
-
Dec 2007
Tenant improvement. new partition walls, new lights, switches and outlets, new sink ada upgrade to water fountain. electrical., plumbing, fire sprinklers, mechanical. life safety under separate permit.
-
Jul 2008
This permit is for the construction of a storefront only. other ti work is under a seperate permit. 11/03/2008.
-
Sep 2008
Interior demolition only of non structural walls. (soft demolition) per ab-17 of vacant ground floor retail space. ti and storefront and accessibility on separate permit.
-
Sep 2008
Commercial t.i. - merging two existing separate retail spaces itno one, new lighting, new fitting room, new partition, new ceiling. drywall & finishes.
-
Sep 2013
5th floor suite 550: interior t.i.: including constuction of new non-bearing partitions and new accessible men's restrooms and new women's restroom per ab-006- mep, fire alarm and sprinklers separate permits.
-
Oct 2013
#650- interior tenant improvement includes new non bearing partition, mechanical & electrical under seperate permit.
-
Jun 2016
Replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower.
-
Mar 2018
2nd floor - demolition of existing ti to create vacant space for future ti under sep permit by others. no structural work - per ab-017.
-
Jul 2018
2nd fl: new tenant improvements: non-brearing partitions; (2) new restrooms; new flooring & paint; new lighting & power; fire sprinklers. no hvac - ducts and equipment to remain. relocate registers. maher n/a.
-
Jul 2018
2nd floor ti - replace existing system (water cooled) ac unit with new add new vav pneumatic vav boxes and reconfigure existing ductwork for new layout. fire alarm under separate permit.
-
Jan 2019
9/f: new tenant improvement for office space. suite 920. maher n/a.
-
Nov 2020
3rd & 8th fl: voluntary barrier removal. create 2 unisex restrooms on each floor. total of 4 restrooms.
DBI holds 125 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 125. 14 of them are nominal $1 street-space or sidewalk permits. 1 expired permit is not shown.
Nearby
- 170–190 Post Street Same street
- 185 Post Street Same street
- 164–166 Grant Avenue Same block
- 80 Maiden Lane Same block
- 135 Post Street Same block
- 69 Maiden Lane Same block
- 220–288 Grant Avenue Around the corner
- 118–120 Maiden Lane Around the corner